Paragraph 2 Non-registration test
Induction meters
Meters shall be tested to ensure that when the current circuits are open and a voltage of 110% of the marked voltage is applied to the voltage circuits, rotors cease to rotate before completing one complete revolution.
Static meters
Meters shall be tested for non-registration by one of the following methods–
-
Method 1
- (a)
- (i)
When subjected to the test conditions specified in paragraph 2(1), meters shall not emit more than one output pulse over a minimum time period determined in paragraph (ii);
- (ii)
Minimum test period=60000/k minutes, where k=number of pulses per kWh emitted by a meter.
- (i)
- (a)
-
Method 2
- (b)
When static meters are fitted with inhibiting circuits, they may be tested for non-registration with a current, which is less than the threshold current in respect of a meter of that type, applied to the current circuits and a voltage of 100% of the marked voltage applied to the voltage circuits of the meters under test. Meters shall not emit more than one output pulse over a minimum time period determined as follows–
where V=marked voltage, I=total current and k=number of pulses emitted per kWh by a meter.
- (b)
-
Method 3
- (c)
The period calculated for Method 1 or Method 2 may be halved, provided that the meters under test do not emit any output pulses during the period of the test.
- (c)