# Meters (Certification) Regulations (Northern Ireland) 1998, Paragraph 1: Pre-heating

Extent: N.I.

(1) The following tests shall not be carried out until the voltage circuits of meters under test and the voltage circuit of working standard integrating meters have been energised for a period of one hour or half an hour if a current of not less than either 10% of basic current or 5% of marked current is applied to the current circuit of the meters, save that the non-registration and starting current tests may be carried out during the pre-heating period.
(2) Sub-paragraph (1) shall not apply to a meter which the examiner is satisfied is capable of full operation as soon as it is energised.

---
Source: https://www.legislation.gov.uk/nisr/1998/444/schedule/1/paragraph/1n1 (the official version)
Page: https://openlegislation.uk/meters-certification-regulations-northern-ireland-1998/schedule-1/paragraph-1n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

