# The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016, Paragraph 8

Extent: E+W

(1) If any permanent or temporary alterations or additions to railway property, or to any protective works under paragraph 4(4), are reasonably necessary in consequence of the construction of a specified work such alterations and additions may be carried out by Network Rail and if Network Rail gives to the Executive reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), the Executive must pay to Network Rail the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by Network Rail in maintaining, working and, when necessary, renewing any such alterations or additions.
(2) If during the construction of a specified work by the Executive, Network Rail gives notice to the Executive that Network Rail desires itself to construct that part of the specified work which in the opinion of the engineer is endangering the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the Executive decides that that part of the specified work is to be constructed, Network Rail must assume construction of that part of the specified work and the Executive must, regardless of any such approval of a specified work under paragraph 4(1), pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may suffer by reason of the execution by Network Rail of that specified work.
(3) The engineer must, in respect of the capitalised sums referred to in this paragraph and paragraph 9(a) provide such details of the formula by which those sums have been calculated as the Executive may reasonably require.
(4) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the Executive to Network Rail under this paragraph.

---
Source: https://www.legislation.gov.uk/uksi/2016/545/schedule/6/paragraph/8 (the official version)
Page: https://openlegislation.uk/midland-metro-birmingham-city-centre-extension-etc-land-acquisition-and-variation-order-2016/schedule-6/paragraph-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.