# The Midland Metro (Wolverhampton City Centre Extension) Order 2016, Paragraph 15: Alterations to waterway

Extent: E+W

(1) If during the construction of a specified work or a protective work (or during a period of 24 months after the completion of those works) any alterations or additions, either permanent or temporary, to a waterway are reasonably necessary in consequence of the construction of the specified work or the protective work in order to avoid detriment, and CRT gives to the Authority reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), the Authority must pay to CRT the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by CRT in maintaining, working and, when necessary, renewing any such alterations or additions.
(2) If the cost of maintaining, working or renewing the waterway is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the Authority to CRT under this paragraph.

---
Source: https://www.legislation.gov.uk/uksi/2016/684/schedule/10/paragraph/15 (the official version)
Page: https://openlegislation.uk/midland-metro-wolverhampton-city-centre-extension-order-2016/schedule-10/paragraph-15
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.