{
  "url": "https://openlegislation.uk/millbrook-gas-fired-generating-station-order-2019/schedule-1/paragraph-wrapper14n1",
  "json_url": "https://openlegislation.uk/millbrook-gas-fired-generating-station-order-2019/schedule-1/paragraph-wrapper14n1.json",
  "legislation": "uksi/2019/578",
  "legislation_title": "The Millbrook Gas Fired Generating Station Order 2019",
  "legislation_url": "https://openlegislation.uk/millbrook-gas-fired-generating-station-order-2019",
  "path": "schedule/1/paragraph/wrapper14n1",
  "kind": "paragraph",
  "number": null,
  "heading": null,
  "text": "Work No. 6 development comprising an electrical substation at transmission tower ZA378 and works to construct a 400kV electrical connection between transmission tower ZA378 and Work No. 5 and mitigation works for Works Nos. 1, 3, 6, and 7—\n(a) 400kV electricity substation including site office and welfare accommodation, emergency auxiliary supplies and downleads to connect to existing tower ZA378;\n(b) underground or ducted high voltage electrical cables and associated telemetry and electrical protection auxiliary cabling and below ground drainage works;\n(c) security infrastructure including perimeter fencing with gates, security cameras, site lighting infrastructure, including perimeter lighting columns;\n(d) permanent means of access from the low level restoration scheme secondary access to numbered work 6(a), taking the form of an agricultural hard-core track not more than 6 m wide and creation of permanent diversion of the low level restoration scheme secondary access;\n(e) permanent means of access taking the form of an agricultural hard-core track not more than 6 m wide;\n(f) landscaping including bunds, tree planting, temporary and permanent fencing and other boundary treatments and ecological mitigation;\n(g) site drainage and waste management infrastructure, including the diversion of a watercourse;\n(h) electricity and telecommunications connections and other services;\n(i) internal roadways, car parking, pedestrian network and hardstanding for planning maintenance; and\n(j) construction laydown area(s) including areas of hardstanding and site and welfare offices and workshops,",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 substituted (9.4.2020) by The Millbrook Gas Fired Generating Station (Amendment) Order 2020 (S.I. 2020/413), arts. 1, 3(4)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/578/schedule/1/paragraph/wrapper14n1",
    "retrieved_at": "2026-10-28T22:44:29.038654+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}