Table 11
(1)Document name
(2)Document reference
(3)Revision number
(4)Date
access road visibility splay plan (contained in appendix 2.1 of appendix 12.1 of the environmental statement)
Drawing reference 31116/2001/008
B
April 2018
book of reference
4.3
3
August 2018
design principles statement
10.2
0
October 2017
environmental statement, Main statement
6.1
0
October 2017
Appendix Volume A: 1.1 Glossary
6.2
0
October 2017
Appendix Volume B: 1.2 Scoping Report and Scoping Opinion
6.2
0
October 2017
Appendix Volume C: 2.6-2.14 Legislation and Policy
6.2
0
October 2017
Appendix Volume D: 3.1 Mitigation Roadmap
6.2
0
October 2017
Appendix Volume E: 3.2 Outline CEMP
6.2
2
July 2018
Appendix Volume F: 5.1 CHP Statement
6.2
0
October 2017
Appendix Volume G: 6.1-6.3 Air Quality
6.2
0
October 2017
Appendix Volume H: 7.1 Noise
6.2
0
October 2017
Appendix Volume H: 7.2 and 7.3 Noise
6.2
1
April 2018
Appendix Volume I: 8.1-8.5 Ecology
6.2
0
October 2017
Appendix Volume J: 10.1 Ground Conditions
6.2
0
October 2017
Appendix Volume K: 11.1 and 11.2 LVIA
6.2
0
October 2017
Appendix Volume K: 11.3 LVIA
6.2
1
April 2018
Appendix Volume L: 12.1 TA (save in respect of Appendix 2.1)
6.2
0
October 2017
Appendix Volume L: Appendix 2.1 of the TA
6.2
Drawing reference 31116/2001/0008
B
April 2018
Appendix Volume M: 13.1-13.3 Historic Environment
6.2
0
October 2017
Appendix Volume N: 15.1 Electric and Magnetic Fields Assessment Report
6.2
0
October 2017
Figures (save in respect of Figure 11.1)
6.3
0
October 2017
Figure 11.1
6.3
1
April 2018
Non-technical summary
6.4
0
October 2017
the indicative site layout plans
2.3
2
June 2019
land plans
2.5
2
June 2019
the low level restoration scheme baseline works plan
Drawing reference: J0008128-409
0
April 2018
the outline construction environment management plan (contained in appendix 3.2 of the environmental statement)
6.2
2
July 2018
the outline construction traffic management measures (contained in the outline construction environment management plan and appendices 5.2 to 5.5 of appendix 12.1 of the environmental statement)
6.2
0
October 2017
the outline landscape and ecological mitigation and management strategy (contained in appendix 11.2 of the environmental statement)
6.2
2
June 2019
the outline lighting strategy (contained in appendix 11.3 of the environmental statement)
6.2
0
October 2017
the outline travel plan (contained in appendix 12.1 of the environmental statement)
6.2
0
October 2017
the rights of way, streets and access plan
2.7
3
June 2019
Works plans
2.6
2
June 2019

---
Source: https://www.legislation.gov.uk/uksi/2019/578/schedule/14 (the official version)
Page: https://openlegislation.uk/millbrook-gas-fired-generating-station-order-2019/schedule-14
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.