  "url": "https://openlegislation.uk/millbrook-gas-fired-generating-station-order-2019/schedule-2/paragraph-2",
  "json_url": "https://openlegislation.uk/millbrook-gas-fired-generating-station-order-2019/schedule-2/paragraph-2.json",
  "legislation": "uksi/2019/578",
  "legislation_title": "The Millbrook Gas Fired Generating Station Order 2019",
  "legislation_url": "https://openlegislation.uk/millbrook-gas-fired-generating-station-order-2019",
  "path": "schedule/2/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": "Detailed design approval",
  "text": "(1) The authorised development must be carried out in accordance with the approved plans listed in Table 1 below, inclusive of any limits of deviation, and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authorities pursuant to any requirement (as the same may be amended by approval of the relevant planning authorities pursuant to requirement 19)—\nTable 1\nWorks plans\nRights of way, streets and access plan\nThe access road visibility splay plan\n(2) The authorised development must be carried out in accordance with the parameters specified below (as the same may be amended by approval of the relevant planning authorities pursuant to requirement 19)—\nTable 2\nBuilding or structure\nMaximum height (metres above existing site level of approximately 31.5 metres AOD unless otherwise stated)\nMinimum height (metres above existing site level of approximately 31.5 metres AOD unless otherwise stated)\nMaximum length (metres)\nMinimum length (metres)\nMaximum width (metres)\nMinimum width (metres)\nThe gas turbine generator (including gas turbine, generator, air inlet filter house, air inlet duct, exhaust diffuser, and auxiliaries such as lube oil system, air dryers, fuel gas filter package, instrument air system, compressor washing) (Part of numbered work 1A)\n27\n–\n50\n–\n40\n–\nThe exhaust gas emission flue stack (part of numbered work 1A)\n35\n32.5\n12\n–\n12\n–\nControl room/office/ workshop (part of numbered work 1B)\n7\n–\n45\n–\n25\n–\nEmergency generator (part of numbered work 1B)\n6\n–\n13\n–\n5\n–\nRaw/fire water tank (part of numbered work 1B)\n15\n–\n15\n–\n15\n–\nDemineralised water tank (part of numbered work 1B)\n5\n–\n5\n–\n5\n–\nGas receiving station (including compression station, emergency generator, Joule-Thompson boilers and other auxiliary control cabinets) (part of numbered work 1B)\n10\n–\n70\n–\n50\n–\nFin Fan Cooler(s) (part of numbered work 1A)\n10\n–\n28\n–\n14\n–\nTransformer compound (including generator step up transformer, unit and other transformers, overhead line gantry and associated equipment) (part of numbered work 1C)\n15\n–\n65\n–\n60\n–\nGatehouse (part of numbered work 1D)\n4.5\n–\n9\n–\n8\n–\nAbove ground installation (numbered work 3A)*\n3\n–\n85\n–\n35\n–\nPipeline inspection gauge facility (part of numbered work 3A)*\n3\n–\n35\n–\n30\n–\nMinimum offtake connection (part of numbered work 3A)*\n3\n–\n35\n–\n35\n–\nSubstation (including the auxiliary building) (part of numbered work 6)**\n14\n–\n100\n–\n60\n–\n* Existing site level is approximately 70m AOD ** Existing site level is approximately 49m AOD\n(3) To the extent that design principles for any numbered work are set out in the design principles statement, that numbered work must be designed substantially in accordance with the relevant design principles set out therein.\n(4) Except to the extent approved pursuant to requirement 5, numbered works 1, 3A... and 6(a) must not commence until, for that numbered work, details of the layout, scale and external appearance of the numbered work have been submitted to and approved by the relevant planning authorities.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Sch. 2 para. 2 Table 2 substituted (9.4.2020) by The Millbrook Gas Fired Generating Station (Amendment) Order 2020 (S.I. 2020/413), arts. 1, 4(2), Sch. 1"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Sch. 2 para. 2(4) omitted (9.4.2020) by virtue of The Millbrook Gas Fired Generating Station (Amendment) Order 2020 (S.I. 2020/413), arts. 1, 4(3)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 2 in force at 3.4.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/578/schedule/2/paragraph/2",
    "retrieved_at": "2026-10-28T22:44:29.038654+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}