# The Millbrook Gas Fired Generating Station Order 2019, Schedule 7: STREETS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

Extent: E+W+S

(1) Area
(2) Street to be stopped up
(3) Extent of stopping up
(4) New street to be substituted
Central Bedfordshire Council
low level restoration scheme secondary access track
From the points marked Z to AA on the rights of way, streets
and access plan being approximately 110m.
Commencing at point Z and finishing at point AA using a route within the area marked with orange hatching on the rights of way, streets and access plan.

---