Article 3 Power to construct works
The Council may in the lines and situations and within the limits of deviation and according to the levels shown on the deposited plan and sections construct and maintain the following works—
-
Work No. 1 – Construct a new rock revetment over the existing rock foreshore, over that area coloured pale green, located within the harbour limit, defined on the deposited plan by a purple dash and dotted line and labelled “new rock revetment” to the seaward side of Clyde Street for a total length of 150 metres which rock revetment will extend into the harbour by a length of 30 metres, with the base of the revetment measuring up to 20 metres. The rock revetment will be constructed with rock armour of between 3 and 6 tonnes.
-
Work No. 2 – In pursuit of the Millport Coastal Flood Protection Scheme, construct new offshore rock armour breakwaters, also coloured pale green on the deposited plan and labelled “new rock armour breakwaters” the construction and location of which dictates a requirement for a new navigation channel. The Council will mark the new navigation channel between the Leug and the shore by (a) removing certain existing lights, located on Millport Pier and Stuart Street, Millport and the seasonal light on the Eileans and (b) installing new lights and buoys, all as located and labelled on the deposited plan.