  "url": "https://openlegislation.uk/morgan-offshore-wind-project-generation-assets-order-2025/schedule-1/paragraph-1",
  "json_url": "https://openlegislation.uk/morgan-offshore-wind-project-generation-assets-order-2025/schedule-1/paragraph-1.json",
  "legislation": "uksi/2025/1012",
  "legislation_title": "The Morgan Offshore Wind Project Generation Assets Order 2025",
  "legislation_url": "https://openlegislation.uk/morgan-offshore-wind-project-generation-assets-order-2025",
  "path": "schedule/1/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": null,
  "text": "A nationally significant infrastructure project as defined in sections 14 (nationally significant infrastructure projects: general) and 15 (generating stations) of the 2008 Act located in the Irish Sea approximately 36 kilometres from the coast of north-west England comprising an offshore wind generating station with an electrical output capacity of over 100MW.\nWork No. 1—\n(a) up to 96 wind turbine generators; and\n(b) a network of subsea inter-array cables between the wind turbine generators including cable crossings and cable protection;\nWork No. 2— up to four offshore substation platforms; and\nWork No. 3— a network of subsea interconnector cables between the offshore substation platforms including cable crossings and cable protection.\nIn connection with the scheduled works and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope of the work assessed by the environmental statement, including—\n(a) scour protection around the foundations of the offshore structures;\n(b) cable protection measures, such as the placement of rock and/or concrete mattresses, with or without frond devices;\n(c) dredging;\n(d) the removal of material from the seabed and the disposal of inert material of natural origin within the Order limits produced during construction drilling, seabed preparation for foundation works, cable installation preparation such as sandwave clearance, boulder clearance and pre-trenching;\n(e) creation and use of temporary vessel laydown areas and use of cable anchors;\n(f) removal of static fishing equipment;\n(g) the use of extracted seabed material within gravity base foundations; and\n(h) lighting.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 para. 1 in force at 22.9.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1012/schedule/1/paragraph/1",
    "retrieved_at": "2026-10-28T21:11:41.004803+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}