{
  "url": "https://openlegislation.uk/morgan-offshore-wind-project-generation-assets-order-2025/schedule-2/paragraph-2",
  "json_url": "https://openlegislation.uk/morgan-offshore-wind-project-generation-assets-order-2025/schedule-2/paragraph-2.json",
  "legislation": "uksi/2025/1012",
  "legislation_title": "The Morgan Offshore Wind Project Generation Assets Order 2025",
  "legislation_url": "https://openlegislation.uk/morgan-offshore-wind-project-generation-assets-order-2025",
  "path": "schedule/2/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": "Design parameters",
  "text": "(1) The wind turbine generators to be constructed as part of the authorised development must be located within the area shown on the works plan.\n(2) No part of any wind turbine generators to be constructed as part of the authorised development shall extend beyond the Order limits.\n(3) The authorised development must be constructed in accordance with the parameters assessed in the environmental statement and set out in Table 1.\n(4) The undertaker may not undertake Work No. 1 in a manner which would give rise to any materially new or materially different environmental effects to those identified in the environmental statement based upon the maximum design scenarios set out in Table 3.5 of the environmental statement.\n(5) References to the location of an offshore surface structure in Table 1 is a reference to the centre point of that structure.\n(6) In the event that driven or part-driven pile foundations are proposed to be used, the hammer energy used to drive or part-drive the pile foundations must not exceed—\n(a) 4,400kJ in respect of pin pile foundations at up to 16 locations; and\n(b) 3,000kJ in respect of any other foundations.\nTable 1\nParameter\nValue\nMaximum number of wind turbine generators\n96\nMaximum height of wind turbine generators when measured from LAT to the tip of the vertical blade (m)\n364\nMaximum rotor diameter of each wind turbine generator (m)\n320\nMaximum rotor swept area (m2)\n5,468,884\nMinimum distance from LAT to the lowest point of the rotating blade for each turbine (m)\n34\nMinimum distance from HAT to the lowest point of the rotating blade for each turbine (m)\n26\nMinimum distance between all offshore surface structures (in all directions) (m)\n1,400\nMaximum diameter of pin-piles for wind turbine generators on jacket pin-pile foundations (m)\n5.5\nMaximum diameter of gravity base at the seabed for wind turbine generators on gravity base foundations (m)\n49\nMaximum diameter of buckets for wind turbine generators on suction bucket jackets (m)\n18\nMaximum diameter of pin-piles for offshore substation platforms on jacket pin-pile foundations (m)\n5.5\nMaximum diameter of gravity base at the seabed for offshore substation platforms on gravity base foundations (m)\n80\nMaximum diameter of buckets for offshore substation platforms on suction bucket jackets (m)\n18\nMaximum number of wind turbines on jacket driven pin-pile foundations\n64\nMaximum total volume of extracted seabed material to be used in gravity base foundations (m3)\n490,000\nMaximum total seabed footprint of wind turbine generators (including scour protection) (m2)\n735,488\nMaximum volume of scour protection for wind turbine generators (m3)\n1,701,998\nMaximum volume of scour protection for offshore substation foundations (m3)\n58,361\nMaximum number of offshore substation platforms\n4\nMaximum dimensions of offshore substations (excluding towers, helipads, masts, and cranes):\nHeight when measured from LAT (m)\n70\nLength (m)\n80\nWidth (m)\n60\nMaximum total seabed footprint area for offshore substation foundations (including scour protection) (m2)\n24,964\nMaximum total length of cables (km)\n450\nMaximum number of cable crossings\n20\nMaximum volume of cable protection (inter-array and interconnector) (m3)\n852,600\nMaximum total seabed footprint area for cable protection (inter-array and interconnector) (m2)\n548,800",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 2 para. 2(4) substituted (9.4.2026) by The Morgan Offshore Wind Project Generation Assets (Correction) Order 2026 (S.I. 2026/441), art. 1, Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 2 in force at 22.9.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1012/schedule/2/paragraph/2",
    "retrieved_at": "2026-10-28T21:11:41.004803+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}