# The Morlais Demonstration Zone Order 2021, Article 5: Power to operate


(1) The undertaker may operate and use the authorised works as a system for generating and transmitting electricity.
(2) In operating the tidal works the undertaker must comply with the documents set out in Part 4 of Schedule 1 as approved to the extent relevant to the operation and use of the tidal works.

---