# The National Grid (Bramford to Twinstead Reinforcement) Order 2024, ASSOCIATED DEVELOPMENT

Extent: E+W

Such associated development not listed above, within the Order limits, as may be necessary or expedient for the purposes of or in connection with the construction or maintenance of the above Work Nos. or any of them, including—
(a) ramps, means of access, footpaths, bridleways, trackways and pontoons;
(b) embankment, bridge, aprons, abutments, foundations, retaining walls, drainage, wing walls, fencing and culverts;
(c) works to alter the position of apparatus, including mains, sewers, drains, conductors and cables;
(d) works to alter the position of UKPN apparatus, including construction and installation, decommissioning and partial removal and alteration of conductors and cables;
(e) works to alter the course of, or otherwise interfere with a watercourse, drainage works, attenuation ponds, and temporary culverts;
(f) landscaping and other works to mitigate any adverse effects of the construction, maintenance, operation or use of the authorised development, together with means of access;
(g) tree and hedgerow planting and maintenance works;
(h) works for the benefit or protection of the environment;
(i) works for the benefit or protection of land, structures, apparatus or equipment affected by the authorised development (including arcing horns, earthing and works for monitoring);
(j) works required for the strengthening, improvement, maintenance, or reconstruction of any streets;
(k) works to streets and any alteration, removal or installation of road furniture, including where required to facilitate the construction of temporary accesses;
(l) site preparation works, site clearance (including fencing, vegetation removal, demolition of existing buildings or structures and the creation of alternative footpaths), earthworks (including soil stripping and storage, site levelling, ground improvement);
(m) establishment of site construction compounds, temporary laydown and storage areas, temporary offices, temporary vehicle parking, construction fencing, perimeter enclosure, security fencing, construction related buildings, welfare facilities, construction and security lighting and haulage roads;
(n) establishment of launch pits and/or receiving pits to facilitate the use of horizontal directional drilling techniques to install any underground electric line;
(o) wheel cleaning facilities;
(p) supervisory control and data acquisition communication equipment;
(q) installation of wires, cables, ducts, pipes and conductors, establishment of winching points and the installation of scaffolding; and
(r) such other works, including scaffolding, working sites storage areas, and works of demolition (which includes but is not limited to demolition of residential properties), as may be necessary or expedient for the purposes of or in connection with the construction of the authorised development and which do not give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.

---
Source: https://www.legislation.gov.uk/uksi/2024/958/schedule/1/crossheading/associated-development (the official version)
Page: https://openlegislation.uk/national-grid-bramford-to-twinstead-reinforcement-order-2024/schedule-1/crossheading-associated-development
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.