  "url": "https://openlegislation.uk/national-grid-hinkley-point-c-connection-project-order-2016/schedule-1/crossheading-hinkley-line-entries",
  "json_url": "https://openlegislation.uk/national-grid-hinkley-point-c-connection-project-order-2016/schedule-1/crossheading-hinkley-line-entries.json",
  "legislation": "uksi/2016/49",
  "legislation_title": "The National Grid (Hinkley Point C Connection Project) Order 2016",
  "legislation_url": "https://openlegislation.uk/national-grid-hinkley-point-c-connection-project-order-2016",
  "path": "schedule/1/crossheading/hinkley-line-entries",
  "kind": "crossheading",
  "number": null,
  "heading": "HINKLEY LINE ENTRIES",
  "text": "Works to reconfigure 400kV overhead electric lines consisting of—\nIn the District of West Somerset\nWork No. 6A\nThe construction and installation of a 400kV overhead electric line conductors, insulators and fittings, including the installation of 5 pylons (ZZ1 to ZZ5 inclusive) and the installation of new conductors between Shurton 400kV Substation, adjacent to new pylon ZZ1 and existing pylon ZZ7. The route is 1.8km in length shown on Works Plans section H, sheets 1 and 2.\nIn the District of West Somerset\nWork No. 6B\nThe removal of 1.4km of overhead electric line to include 3 existing pylons (ZZ4, ZZ5 and ZZ6) and conductors between existing pylons ZG1 to ZZ4 and pylons JP4 to ZZ4 and then continuing between ZZ4 and ZZ7 as shown on Works Plans section H, sheets 1 and 2.\nIn the District of West Somerset\nWork No. 6C\nThe construction and installation of a 400kV overhead electric line conductors, insulators and, fittings, including the installation of 5 new pylons (VQ1, VQ2, VQ3, VQ3A, VQ3B) and the installation of new conductors between Shurton 400kV Substation, adjacent new pylon VQ1 and existing pylon VQ4. The route is 1.7km in length as shown on Works Plans section H, sheets 1 and 2.\nIn the District of West Somerset\nWork No. 6D\nThe removal of 900m of overhead electric line to include 3 existing pylons (VQ1, VQ2 and VQ3) and conductors between cable sealing end pylon VQ1 and existing pylon VQ4 as shown on Works Plans section H, sheets 1 and 2.\nIn the District of West Somerset\nWork No. 6E\nThe construction and installation of a 400kV overhead electric line conductors, insulators and fittings, including the installation of 3 new pylons (JP1, JP2 and JP3) and the installation of new conductors between ZG1 and JP3, JP6 and JP3 and from JP3 to JP1, including downlead connections. The route is 1km in length as shown on Works Plans section H, sheets 1 and 2.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2016/49/schedule/1/crossheading/hinkley-line-entries",
    "retrieved_at": "2026-10-28T23:28:15.566000+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}