# The National Grid (Hinkley Point C Connection Project) Order 2016, Part 9: LANDSCAPE DRAWINGS


Drawing Title
Drawing Number
Revision
Bridgwater Tee Cable Sealing End Compounds – Landscape Mitigation and Detailed Planting Plans
Environmental Statement Document 5.7.3.14A,
Figures 7.32.1 to 7.32.4
B
South of Mendip Hills Cable Sealing End Compound – Landscape Mitigation and Detailed Planting Plans
Environmental Statement Document 5.7.3.14A,
Figures 7.33.1 to 7.33.5
B
River Axe Cable Bridge Option – Landscape Mitigation and Detailed Planting Plan
Environmental Statement Document 5.7.3.14A,
Figure 7.34.1
B
Sandford Substation – Landscape Mitigation Phasing and Detailed Planting Plans
Environmental Statement Document 5.7.3.14A,
Figures 7.35.1 to 7.35.6
B
Towerhead Brook Bridge – Landscape Mitigation and Detailed Planting Plan
Environmental Statement Document 5.7.3.14A,
Figure 7.36.1
B

---
Source: https://www.legislation.gov.uk/uksi/2016/49/schedule/2/part/9 (the official version)
Page: https://openlegislation.uk/national-grid-hinkley-point-c-connection-project-order-2016/schedule-2/part-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.