# The National Grid (Hinkley Point C Connection Project) Order 2016, Paragraph 33: Clearance over main rivers


No part of any 400kV overhead electric line may be installed or maintained directly above any main river at a height of less than 10.9 metres above the top level of the bank of that river.

---