  "url": "https://openlegislation.uk/national-grid-kings-lynn-b-power-station-connection-order-2013/schedule-2/paragraph-3",
  "json_url": "https://openlegislation.uk/national-grid-kings-lynn-b-power-station-connection-order-2013/schedule-2/paragraph-3.json",
  "legislation": "uksi/2013/3200",
  "legislation_title": "The National Grid (King’s Lynn B Power Station Connection) Order 2013",
  "legislation_url": "https://openlegislation.uk/national-grid-kings-lynn-b-power-station-connection-order-2013",
  "path": "schedule/2/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": "Compliance with approved details",
  "text": "(1) The construction of the lattice towers forming part of the authorised development comprised in Work No 1 must take place in general accordance with the approved drawings listed below unless otherwise approved in writing by the relevant planning authority—\n(a) A3/MIS/21847/071 A;\n(b) BNT167/7050 D;\n(c) BNT167/7053/B;\n(d) BNT167/7056 C;\n(e) BNT167/7055 B.\nFor the purposes of this Requirement 3(1) in determining general accordance the towers must be constructed within the vertical limits of deviation and must be substantially the same as those shown on the drawings (including the plan views shown on those drawings) for the respective towers as follows—\nPylon ID\nDrawing No\nTower Type (Height metres)\nTower Type including LOD (metres)\nKL001\nBNT167/7055/B\nL13 DT STD (48.071)\nL13 DT E3 (51.071)\nKL002\nBNT167/7053/B\nL13 D60 E3 (53.952)\nL13 D60 E6 (56.952)\nKL003\nBNT167/7050/D\nL13 D E3 (52.950)\nL13 D E6 (55.950)\nKL004\nBNT167/7053/B\nL13 D60 E6 (56.952)\nL13 D60 E9 (59.952)\nKL005\nBNT167/7050/D\nL13 D E6 (55.950)\nL13 D E9 (58.950)\nKL006\nBNT167/7050/D\nL13 D E6 (55.950)\nL13 D E9 (58.950)\nKL007\nBNT167/7053/B\nL13 D60 STD (50.952)\nL13 D60 E3 (53.952)\nKL008\nBNT167/7050/D\nL13 D E3 (52.950)\nL13 D E6 (55.950)\nNew 4VV39\nBNT167/7056/C\nL13 DJT STD (53.460)\nL13 DJT E3 (56.460)\n(2) The remainder of the authorised development referred to in Schedule 1 must be carried out in general accordance with the approved drawings listed below unless otherwise agreed in writing with the relevant planning authority and must be within the Order limits—\n(a) A1/PTD/6320/080/Rev A;\n(b) A1/PTD/6320/008/Rev B;\n(c) A1/PTD/6320/009/Rev A;\n(d) A1/PTD/6320/010/Rev A;\n(e) A1/PTD/6320/011/Rev A;\n(f) A1/PTD/6320/012/Rev A;\n(g) A1/PTD/6320/013/Rev B;\n(h) A1/PTD/6320/014/Rev A;\n(i) A1/PTD/6320/015/Rev B;\n(j) A1/PTD/6320/066/Rev A;\n(k) A1/PTD/6320/067/Rev A;\n(l) A1/PTD/6320/068/Rev A;\n(m) A1/PTD/6320/069/Rev A.\nFor the purpose of this Requirement 3(2) development must be substantially the same as shown on the approved drawings listed above subject always to account being taken of any variation of the alignment of Work No 1 within the lateral limits of deviation in article 6 from that indicated on the works plans.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 3 in force at 9.1.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2013/3200/schedule/2/paragraph/3",
    "retrieved_at": "2026-10-29T00:31:35.453371+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}