# The National Grid (King’s Lynn B Power Station Connection) Order 2013, Paragraph 3: Compliance with approved details

Extent: E+W+S

(1) The construction of the lattice towers forming part of the authorised development comprised in Work No 1 must take place in general accordance with the approved drawings listed below unless otherwise approved in writing by the relevant planning authority—
(a) A3/MIS/21847/071 A;
(b) BNT167/7050 D;
(c) BNT167/7053/B;
(d) BNT167/7056 C;
(e) BNT167/7055 B.
For the purposes of this Requirement 3(1) in determining general accordance the towers must be constructed within the vertical limits of deviation and must be substantially the same as those shown on the drawings (including the plan views shown on those drawings) for the respective towers as follows—
Pylon ID
Drawing No
Tower Type (Height metres)
Tower Type including LOD (metres)
KL001
BNT167/7055/B
L13 DT STD (48.071)
L13 DT E3 (51.071)
KL002
BNT167/7053/B
L13 D60 E3 (53.952)
L13 D60 E6 (56.952)
KL003
BNT167/7050/D
L13 D E3 (52.950)
L13 D E6 (55.950)
KL004
BNT167/7053/B
L13 D60 E6 (56.952)
L13 D60 E9 (59.952)
KL005
BNT167/7050/D
L13 D E6 (55.950)
L13 D E9 (58.950)
KL006
BNT167/7050/D
L13 D E6 (55.950)
L13 D E9 (58.950)
KL007
BNT167/7053/B
L13 D60 STD (50.952)
L13 D60 E3 (53.952)
KL008
BNT167/7050/D
L13 D E3 (52.950)
L13 D E6 (55.950)
New 4VV39
BNT167/7056/C
L13 DJT STD (53.460)
L13 DJT E3 (56.460)
(2) The remainder of the authorised development referred to in Schedule 1 must be carried out in general accordance with the approved drawings listed below unless otherwise agreed in writing with the relevant planning authority and must be within the Order limits—
(a) A1/PTD/6320/080/Rev A;
(b) A1/PTD/6320/008/Rev B;
(c) A1/PTD/6320/009/Rev A;
(d) A1/PTD/6320/010/Rev A;
(e) A1/PTD/6320/011/Rev A;
(f) A1/PTD/6320/012/Rev A;
(g) A1/PTD/6320/013/Rev B;
(h) A1/PTD/6320/014/Rev A;
(i) A1/PTD/6320/015/Rev B;
(j) A1/PTD/6320/066/Rev A;
(k) A1/PTD/6320/067/Rev A;
(l) A1/PTD/6320/068/Rev A;
(m) A1/PTD/6320/069/Rev A.
For the purpose of this Requirement 3(2) development must be substantially the same as shown on the approved drawings listed above subject always to account being taken of any variation of the alignment of Work No 1 within the lateral limits of deviation in article 6 from that indicated on the works plans.

---
Source: https://www.legislation.gov.uk/uksi/2013/3200/schedule/2/paragraph/3 (the official version)
Page: https://openlegislation.uk/national-grid-kings-lynn-b-power-station-connection-order-2013/schedule-2/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.