# The National Grid (North London Reinforcement Project) Order 2014, Schedule 5: STREETS TO BE PERMANENTLY STOPPED UP

Extent: E+W+S

(1)
Area
(2)
Street to be permanently stopped up
(3)
Extent of stopping up
(4)
New street to be substituted
London Borough of Enfield
Part of Footpath T on the dismantled railway at Brimsdown
From FP50 to FP51 shown on Sheet 5 of the Access/Rights of Way Plans
A footpath between FP50 and FP51 via FP54 and FP56 shown on Sheet 5 of the Access/Rights of Way Plans.
On completion of Work No. 7D new Footpath U will be created across the Prince of Wales Playing Field linking Footpath T to Footpath No. 103 between FP44 and FP50 via FP55 and FP54 and between FP44 and FP51 via FP55 and FP56 shown on Sheet 5 of the Access/Rights of Way Plans.
Section of Footpath No. 103 at Brimsdown between Small River Lee and Brancroft Way
From FP45 to FP46 shown on Sheet 5 of the Access/Rights of Way Plans
A footpath between FP45 and FP46 via FP48 shown on Sheet 5 of the Access/Rights of Way Plans.

---
Source: https://www.legislation.gov.uk/uksi/2014/1052/schedule/5 (the official version)
Page: https://openlegislation.uk/national-grid-north-london-reinforcement-project-order-2014/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.