# The National Grid (Richborough Connection Project) Development Consent Order 2017, Schedule 6: STREETS SUBJECT TO TEMPORARY ALTERATION OF LAYOUT

Extent: E+W

Canterbury City Council
(1)
(2)
Street subject to alteration of layout
Description of alteration of layout as shown on the Access and Rights of Way and Public Rights of Navigation Plans
Broad Oak Road
At BM01, BM02 and BM05 (as shown on Sheet 1) the creation of three temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Vauxhall Road
At BM03 and BM04 (as shown on Sheet 1) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Shalloak Road
At BM06, BM08, BM09, BM10, BM11 and BM12 (as shown on Sheet 2) the creation of six temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Broad Oak Road
At BM07 (as shown on Sheet 2) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Mayton Lane
At BM13 (as shown on Sheet 3) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Barnets Lane
At BM14 and BM15 (as shown on Sheet 3) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
A291 Herne Bay Road
At BM16, BM17, BM18, BM19, BM20 and BM21 (as shown on Sheet 2 and Sheet 3) the creation of six temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Hoath Road
At BM22 (as shown on Sheet 4) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Bredlands Lane
At BM23 and BM24 (as shown on Sheet 4) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Chislet Park Access (A28)
At BM25 and BM26 (as shown on Sheet 7) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
A28 Island Road
At BM27, BM30, BM32 (as shown on Sheet 7 and Sheet 10) the creation of three temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Sandpit Hill
At BM28 and BM29 (as shown on Sheet 8) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Old Road
At BM31 (as shown on Sheet 10) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Westbere Compound
At BM39 (as shown on Sheet 4) entrance of existing bellmouth will be widened to allow HGV access and egress. Comprising the installation of a new road surface, white lining, kerbing and suitable drainage system where required.
Thanet District Council
(1)
(2)
Street subject to alteration of layout
Description of alteration of layout as shown on the Access and Rights of Way and Public Rights of Navigation Plans
A253 Ramsgate Road/Mile Road
At BM33 (as shown on Sheet 11) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
A253 via Gore Street
At BM34, BM35, BM36 and BM37 (as shown on Sheet 11) the creation of four temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.
Dover District Council
(1)
(2)
Street subject to alteration of layout
Description of alteration of layout as shown on the Access and Rights of Way and Public Rights of Navigation Plans
A256
At BM38 (as shown on Sheet 17) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.

---
Source: https://www.legislation.gov.uk/uksi/2017/817/schedule/6 (the official version)
Page: https://openlegislation.uk/national-grid-richborough-connection-project-development-consent-order-2017/schedule-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.