{
  "url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-1/crossheading-overhead-electric-lines-and-overton-substation-north-west-of-york",
  "json_url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-1/crossheading-overhead-electric-lines-and-overton-substation-north-west-of-york.json",
  "legislation": "uksi/2024/393",
  "legislation_title": "The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024",
  "legislation_url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024",
  "path": "schedule/1/crossheading/overhead-electric-lines-and-overton-substation-north-west-of-york",
  "kind": "crossheading",
  "number": null,
  "heading": "OVERHEAD ELECTRIC LINES AND OVERTON SUBSTATION (NORTH WEST OF YORK)",
  "text": "In North Yorkshire and the city of York\nWorks to reconfigure the YR overhead electric line and construction and installation of the YN overhead electric line as shown on section B, sheet 1 of the works plan, comprising—\n(a) the reconductoring of the YR/2TW overhead electric line from YR036 to 2TW169, replacement of conductors, fittings, insulators, and fibre optic earthwires, including modifications to existing pylons;\n(b) the construction and installation of a temporary diversion of the YR overhead electric line from YR038 to 2TW169, including conductors, fibre optic earthwires, insulators, fittings and two temporary structures;\n(c) the construction and installation of an overhead electric line from YR040 to YN004 including five pylons, conductors, fibre optic earthwires, insulators, fittings and connections into the new Shipton North and Shipton South cable sealing end compounds referred to at paragraph (f) .\nIn North Yorkshire\n(d) the installation of an underground cable to facilitate a connection between Shipton North and Shipton South cable sealing end compounds referred to at paragraph (f);\n(e) the dismantling and removal of existing pylon YR040T, including foundations;\n(f) the construction and installation of two cable sealing end compounds, Shipton North and Shipton South, containing sealing end equipment, including anchor blocks at Shipton North and a gantry at Shipton South, switchgear, earthing and protection control systems, and connections to the overhead electric line;\n(g) the installation of one temporary construction compound; and\nIn the city of York\n(h) the installation of one temporary construction compound.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/393/schedule/1/crossheading/overhead-electric-lines-and-overton-substation-north-west-of-york",
    "retrieved_at": "2026-10-28T21:32:16.250831+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}