# The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024, Paragraph 14: Fencing

Extent: E+W+S

Where so required by the engineer the undertaker must, to the reasonable satisfaction of the engineer, fence off a specified work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work from the waterway, whether on a temporary or permanent basis or both.

---