# The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024, Paragraph 64: General

Extent: E+W+S

Notwithstanding the limits of deviation permitted pursuant to article 5 (limits of deviation) of this Order, no works in carrying out, maintaining or diverting the authorised development may be carried out on, under or over the strategic road network at a distance within 5.5 metres vertically of the lowest point of the ground unless with the express consent of National Highways save in respect of any temporary oversailing equipment which falls below the 5.5m height temporarily during construction, provided that such equipment’s installed position is above 5.5m, where such express consent is not required.

---
Source: https://www.legislation.gov.uk/uksi/2024/393/schedule/15/paragraph/64 (the official version)
Page: https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-15/paragraph-64
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.