# The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024, Paragraph 98: Interpretation

Extent: E+W+S

In this Part—
“1991 Act” means the New Roads and Street Works Act 1991;
“alternative apparatus” means appropriate alternative apparatus to the reasonable satisfaction of the Statutory undertaker to enable the Statutory undertaker to fulfil its statutory functions in a manner no less efficient than previously;
“commence” has the same meaning as in Schedule 3 of the Order;
“functions” includes powers and duties;
“in” in a context referring to Works, apparatus or alternative apparatus in land includes a reference to such Works, apparatus or alternative apparatus under, over, across, along or upon such land;
“maintain” and “maintenance” shall include the ability and right to do any of the following: construct, use, repair, alter, inspect, renew or remove;
“plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed;
“statutory undertaker” means Northern Gas Networks Limited (Company Number 05167070) whose registered office is at 1100 Century Way, Colton, Leeds, LS15 8TU;

---
Source: https://www.legislation.gov.uk/uksi/2024/393/schedule/15/paragraph/98 (the official version)
Page: https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-15/paragraph-98
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.