  "url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-2/part-8",
  "json_url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-2/part-8.json",
  "legislation": "uksi/2024/393",
  "legislation_title": "The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024",
  "legislation_url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024",
  "path": "schedule/2/part/8",
  "kind": "part",
  "number": "8",
  "heading": "ENVIRONMENTAL STATEMENT DOCUMENTS",
  "text": "Document title\nDocument number\nVersion\nES Non Technical Summary\n5.1\nA\nES Chapter 1 Introduction\n5.2.1\nA\nES Chapter 2 Project Need and Alternatives\n5.2.2\nA\nES Chapter 3 Description of the Project\n5.2.3\nA\nES Chapter 4 Approach to preparing the ES\n5.2.4\nA\nES Chapter 5 Legislative and Policy Overview\n5.2.5\nA\nES Chapter 6 Landscape and Visual\n5.2.6\nA\nES Chapter 7 Historic Environment\n5.2.7\nA\nES Chapter 8 Biodiversity\n5.2.8\nA\nES Chapter 9 Hydrology\n5.2.9\nA\nES Chapter 10 Geology and Hydrogeology\n5.2.10\nA\nES Chapter 11 Agriculture and Soils\n5.2.11\nA\nES Chapter 12 Traffic and Transport\n5.2.12\nA\nES Chapter 13 Air Quality\n5.2.13\nA\nES Chapter 14 Noise and Vibration\n5.2.14\nA\nES Chapter 15 Health and Wellbeing\n5.2.15\nA\nES Chapter 16 Socio economics\n5.2.16\nA\nES Chapter 17 Climate Change\n5.2.17\nA\nES Chapter 18 Cumulative Effects\n5.2.18\nA\nEnvironmental Statement Errata Document\n5.2.19\nE\nEnvironmental Statement Addendum\n5.2.22\nB\nAppendix 1A Details of Experts and their Experience.pdf\n5.3.1A\nA\nAppendix 2A Our Approach to Consenting (National Grid)\n5.3.2A\nA\nAppendix 2B Our Approach to Options Appraisal (National Grid)\n5.3.2B\nA\nAppendix 3A Embedded Measures Schedule\n5.3.3A\nC\nAppendix 3B Code of Construction Practice\n5.3.3B\nE\nAppendix 3C Archaeological Written Scheme of Investigation\n5.3.3C\nA\nAppendix 3D Biodiversity Mitigation Strategy\n5.3.3D\nB\nAppendix 3E Outline Soil Management Plan\n5.3.3E\nB\nAppendix 3F Construction Traffic Management Plan\n5.3.3F\nD\nAppendix 3G Public Rights of Way Management Plan\n5.3.3G\nB\nAppendix 3H Noise and Vibration Management Plan\n5.3.3H\nB\nAppendix 3I Arboricultural Impact Assessment (Part 1 of 3)\n5.3.3I (Part 1 of 3)\nD\nAppendix 3I Arboricultural Impact Assessment (Part 2 of 3)\n5.3.3I (Part 2 of 3)\nD\nAppendix 3I Arboricultural Impact Assessment (Part 3 of 3)\n5.3.3I (Part 3 of 3)\nD\nAppendix 4A Scoping Opinion\n5.3.4A\nA\nAppendix 4B Transboundary Screening Matrix\n5.3.4B\nA\nAppendix 5A (No Appendices)\n5.3.5A\nA\nAppendix 6A EIA Scoping Opinion Responses on Landscape and Visual Assessment\n5.3.6A\nA\nAppendix 6B Technical Engagement on Landscape and Visual Assessment\n5.3.6B\nA\nAppendix 6C Landscape and Visual Impact Assessment Methodology\n5.3.6C\nA\nAppendix 6D Landscape Character Baseline\n5.3.6D\nA\nAppendix 6E Landscape Character Sensitivity Assessment\n5.3.6E\nA\nAppendix 6F Landscape Character Receptor Assessment\n5.3.6F\nA\nAppendix 6G Visual Receptor Assessment\n5.3.6G\nA\nAppendix 6H Viewpoint Assessment\n5.3.6H\nA\nAppendix 7A Historic Environment Desk Based Assessment\n5.3.7A\nA\nAppendix 7B Overton Geophysical Survey Results (Plan Only)\n5.3.7B\nA\nAppendix 7C Monk Fryston Geophysical Survey Results (Plan Only)\n5.3.7C\nA\nAppendix 7D Tadcaster Geophysical Survey (Report)\n5.3.7D\nA\nAppendix 7E Trial Trenching at Overton Substation and Monk Fryston Substation\n5.3.7E\nA\nAppendix 7F Technical Note for Beningbrough Hall\n5.3.7F\nA\nAppendix 7G Technical Note for Scheduled Monument at Lead\n5.3.7G\nA\nAppendix 7H Watching Brief on SI works at Marston Moor\n5.3.7H\nA\nAppendix 7I Shipton Geophysical Survey Report\n5.3.7I\nB\nAppendix 7J Tadcaster Geophysical Survey Results (Plan Only)\n5.3.7J\nA\nAppendix 8A Scoping of Assessment Summary\n5.3.8A\nA\nAppendix 8B Extended Phase 1 Habitat Survey Report\n5.3.8B\nD\nAppendix 8C CONFIDENTIAL Badger Survey Report\n5.3.8C\nA\nAppendix 8D Otter and Water Vole Survey Report\n5.3.8D\nA\nAppendix 8E 2021 Wintering Birds Survey Report\n5.3.8E\nA\nAppendix 8F 2021-2022 Wintering Birds Survey Report\n5.3.8F\nA\nAppendix 8G CONFIDENTIAL Schedule 1 Breeding Bird Survey Report\n5.3.8G\nA\nAppendix 8H Bat Survey Report\n5.3.8H\nB\nAppendix 8I GCN District Level Licensing Impact Assessment and Conservation Payment Certificate\n5.3.8I\nA\nAppendix 8J Confidential Schedule 1 Bird Survey Information\n5.3.8J\nA\nAppendix 9A Conservation Sites Screening\n5.3.9A\nA\nAppendix 9B WFD Waterbody Status and Objectives\n5.3.9B\nA\nAppendix 9C Infrastructure Located in WFD Waterbody\n5.3.9C\nA\nAppendix 9D Flood Risk Assessment\n5.3.9D\nB\nAppendix 10A Walkover Survey Records\n5.3.10A\nA\nAppendix 10B Assessment of Physical Effects on Ground Water (Focus Areas)\n5.3.10B\nA\nAppendix 10C Extracts from Unexploded Ordnance (UXO) Reports\n5.3.10C\nA\nAppendix 10D Hydrogeology Water Framework Directive (WFD) Assessment\n5.3.10D\nA\nAppendix 10E Factual Report on Ground Investigation (Socotec 2022)\n5.3.10E\nA\nAppendix 11A Agricultural Land Classification for Shipton North and South CSEC Area\n5.3.11A\nA\nAppendix 11B Agricultural Land Classification for Overton Substation\n5.3.11B\nA\nAppendix 11C Agricultural Land Classification for Tadcaster CSECs\n5.3.11C\nA\nAppendix 11D Agricultural Land Classification for Monk Fryston Substation\n5.3.11D\nA\nAppendix 12A Traffic Modelling Tables\n5.3.12A\nA\nAppendix 13A IAQM Construction Dust Assessment Methodology Tables\n5.3.13A\nA\nAppendix 14A Baseline Noise Report\n5.3.14A\nA\nAppendix 14B Construction Plant and Activity Assumptions\n5.3.14B\nA\nAppendix 14C Construction Modelling Results\n5.3.14C\nA\nAppendix 14D Acoustic Screening Strategy\n5.3.14D\nA\nAppendix 14E Overhead Line Noise Assessment\n5.3.14E\nA\nAppendix 14F National Grid Policy Statement PS(T)134 (2021)\n5.3.14F\nA\nAppendix 14G National Grid Technical Report TR(E)564 (2021)\n5.3.14G\nA\nAppendix 14H National Grid Technical Guidance Note TGN(E)322 (2021)\n5.3.14H\nA\nAppendix 15A (No Appendices)\n5.3.15A\nA\nAppendix 16A (No Appendices)\n5.3.16A\nA\nAppendix 17A (No Appendices)\n5.3.17A\nA\nAppendix 18A Cumulative Effects Assessment Long List of Other Developments\n5.3.18A\nC\nES Chapter 1 Introduction Figures\n5.4.1\nA\nES Chapter 2 Project Need and Alternatives Figures\n5.4.2\nA\nES Chapter 3 Description of the Project Figures\n5.4.3\nE\nES Chapter 4 Approach to preparing the ES Figures (No Figures)\n5.4.4\nA\nES Chapter 5 Legislative and Policy Overview Figures (No Figures)\n5.4.5\nA\nES Chapter 6 Landscape and Visual Figures (Part 1 of 15)\n5.4.6 (Part 1 of 15)\nB\nES Chapter 6 Landscape and Visual Figures (Part 2 of 15)\n5.4.6 (Part 2 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 3 of 15)\n5.4.6 (Part 3 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 4 of 15)\n5.4.6 (Part 4 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 5 of 15)\n5.4.6 (Part 5 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 6 of 15)\n5.4.6 (Part 6 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 7 of 15)\n5.4.6 (Part 7 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 8 of 15)\n5.4.6 (Part 8 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 9 of 15)\n5.4.6 (Part 9 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 10 of 15)\n5.4.6 (Part 10 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 11 of 15)\n5.4.6 (Part 11 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 12 of 15)\n5.4.6 (Part 12 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 13 of 15)\n5.4.6 (Part 13 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 14 of 15)\n5.4.6 (Part 14 of 15)\nA\nES Chapter 6 Landscape and Visual Figures (Part 15 of 15)\n5.4.6 (Part 15 of 15)\nA\nES Chapter 7 Historic Environment Figures\n5.4.7\nA\nES Chapter 8 Biodiversity Figures (Part 1 of 2)\n5.4.8 (Part 1 of 2)\nC\nES Chapter 8 Biodiversity Figures (Part 2 of 2)\n5.4.8 (Part 2 of 2)\nC\nES Chapter 9 Hydrology Figures (Part 1 of 2)\n5.4.9 (Part 1 of 2)\nB\nES Chapter 9 Hydrology Figures (Part 2 of 2)\n5.4.9 (Part 2 of 2)\nB\nES Chapter 10 Geology and Hydrogeology Figures\n5.4.10\nA\nES Chapter 11 Agriculture and Soils Figures\n5.4.11\nA\nES Chapter 12 Traffic and Transport Figures\n5.4.12\nB\nES Chapter 13 Air Quality Figures\n5.4.13\nA\nES Chapter 14 Noise and Vibration Figures\n5.4.14\nA\nES Chapter 15 Health and Wellbeing Figures\n5.4.15\nA\nES Chapter 16 Socio economics Figures\n5.4.16\nA\nES Chapter 17 Climate Change Figures (No Figures)\n5.4.17\nA\nES Chapter 18 Cumulative Effects Figures\n5.4.18\nB",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 Pt. 8 in force at 5.4.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/393/schedule/2/part/8",
    "retrieved_at": "2026-10-28T21:32:16.250831+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}