ES Non Technical Summary
5.1
A
ES Chapter 1 Introduction
5.2.1
A
ES Chapter 2 Project Need and Alternatives
5.2.2
A
ES Chapter 3 Description of the Project
5.2.3
A
ES Chapter 4 Approach to preparing the ES
5.2.4
A
ES Chapter 5 Legislative and Policy Overview
5.2.5
A
ES Chapter 6 Landscape and Visual
5.2.6
A
ES Chapter 7 Historic Environment
5.2.7
A
ES Chapter 8 Biodiversity
5.2.8
A
ES Chapter 9 Hydrology
5.2.9
A
ES Chapter 10 Geology and Hydrogeology
5.2.10
A
ES Chapter 11 Agriculture and Soils
5.2.11
A
ES Chapter 12 Traffic and Transport
5.2.12
A
ES Chapter 13 Air Quality
5.2.13
A
ES Chapter 14 Noise and Vibration
5.2.14
A
ES Chapter 15 Health and Wellbeing
5.2.15
A
ES Chapter 16 Socio economics
5.2.16
A
ES Chapter 17 Climate Change
5.2.17
A
ES Chapter 18 Cumulative Effects
5.2.18
A
Environmental Statement Errata Document
5.2.19
E
Environmental Statement Addendum
5.2.22
B
Appendix 1A Details of Experts and their Experience.pdf
5.3.1A
A
Appendix 2A Our Approach to Consenting (National Grid)
5.3.2A
A
Appendix 2B Our Approach to Options Appraisal (National Grid)
5.3.2B
A
Appendix 3A Embedded Measures Schedule
5.3.3A
C
Appendix 3B Code of Construction Practice
5.3.3B
E
Appendix 3C Archaeological Written Scheme of Investigation
5.3.3C
A
Appendix 3D Biodiversity Mitigation Strategy
5.3.3D
B
Appendix 3E Outline Soil Management Plan
5.3.3E
B
Appendix 3F Construction Traffic Management Plan
5.3.3F
D
Appendix 3G Public Rights of Way Management Plan
5.3.3G
B
Appendix 3H Noise and Vibration Management Plan
5.3.3H
B
Appendix 3I Arboricultural Impact Assessment (Part 1 of 3)
5.3.3I (Part 1 of 3)
D
Appendix 3I Arboricultural Impact Assessment (Part 2 of 3)
5.3.3I (Part 2 of 3)
D
Appendix 3I Arboricultural Impact Assessment (Part 3 of 3)
5.3.3I (Part 3 of 3)
D
Appendix 4A Scoping Opinion
5.3.4A
A
Appendix 4B Transboundary Screening Matrix
5.3.4B
A
Appendix 5A (No Appendices)
5.3.5A
A
Appendix 6A EIA Scoping Opinion Responses on Landscape and Visual Assessment
5.3.6A
A
Appendix 6B Technical Engagement on Landscape and Visual Assessment
5.3.6B
A
Appendix 6C Landscape and Visual Impact Assessment Methodology
5.3.6C
A
Appendix 6D Landscape Character Baseline
5.3.6D
A
Appendix 6E Landscape Character Sensitivity Assessment
5.3.6E
A
Appendix 6F Landscape Character Receptor Assessment
5.3.6F
A
Appendix 6G Visual Receptor Assessment
5.3.6G
A
Appendix 6H Viewpoint Assessment
5.3.6H
A
Appendix 7A Historic Environment Desk Based Assessment
5.3.7A
A
Appendix 7B Overton Geophysical Survey Results (Plan Only)
5.3.7B
A
Appendix 7C Monk Fryston Geophysical Survey Results (Plan Only)
5.3.7C
A
Appendix 7D Tadcaster Geophysical Survey (Report)
5.3.7D
A
Appendix 7E Trial Trenching at Overton Substation and Monk Fryston Substation
5.3.7E
A
Appendix 7F Technical Note for Beningbrough Hall
5.3.7F
A
Appendix 7G Technical Note for Scheduled Monument at Lead
5.3.7G
A
Appendix 7H Watching Brief on SI works at Marston Moor
5.3.7H
A
Appendix 7I Shipton Geophysical Survey Report
5.3.7I
B
Appendix 7J Tadcaster Geophysical Survey Results (Plan Only)
5.3.7J
A
Appendix 8A Scoping of Assessment Summary
5.3.8A
A
Appendix 8B Extended Phase 1 Habitat Survey Report
5.3.8B
D
Appendix 8C CONFIDENTIAL Badger Survey Report
5.3.8C
A
Appendix 8D Otter and Water Vole Survey Report
5.3.8D
A
Appendix 8E 2021 Wintering Birds Survey Report
5.3.8E
A
Appendix 8F 2021-2022 Wintering Birds Survey Report
5.3.8F
A
Appendix 8G CONFIDENTIAL Schedule 1 Breeding Bird Survey Report
5.3.8G
A
Appendix 8H Bat Survey Report
5.3.8H
B
Appendix 8I GCN District Level Licensing Impact Assessment and Conservation Payment Certificate
5.3.8I
A
Appendix 8J Confidential Schedule 1 Bird Survey Information
5.3.8J
A
Appendix 9A Conservation Sites Screening
5.3.9A
A
Appendix 9B WFD Waterbody Status and Objectives
5.3.9B
A
Appendix 9C Infrastructure Located in WFD Waterbody
5.3.9C
A
Appendix 9D Flood Risk Assessment
5.3.9D
B
Appendix 10A Walkover Survey Records
5.3.10A
A
Appendix 10B Assessment of Physical Effects on Ground Water (Focus Areas)
5.3.10B
A
Appendix 10C Extracts from Unexploded Ordnance (UXO) Reports
5.3.10C
A
Appendix 10D Hydrogeology Water Framework Directive (WFD) Assessment
5.3.10D
A
Appendix 10E Factual Report on Ground Investigation (Socotec 2022)
5.3.10E
A
Appendix 11A Agricultural Land Classification for Shipton North and South CSEC Area
5.3.11A
A
Appendix 11B Agricultural Land Classification for Overton Substation
5.3.11B
A
Appendix 11C Agricultural Land Classification for Tadcaster CSECs
5.3.11C
A
Appendix 11D Agricultural Land Classification for Monk Fryston Substation
5.3.11D
A
Appendix 12A Traffic Modelling Tables
5.3.12A
A
Appendix 13A IAQM Construction Dust Assessment Methodology Tables
5.3.13A
A
Appendix 14A Baseline Noise Report
5.3.14A
A
Appendix 14B Construction Plant and Activity Assumptions
5.3.14B
A
Appendix 14C Construction Modelling Results
5.3.14C
A
Appendix 14D Acoustic Screening Strategy
5.3.14D
A
Appendix 14E Overhead Line Noise Assessment
5.3.14E
A
Appendix 14F National Grid Policy Statement PS(T)134 (2021)
5.3.14F
A
Appendix 14G National Grid Technical Report TR(E)564 (2021)
5.3.14G
A
Appendix 14H National Grid Technical Guidance Note TGN(E)322 (2021)
5.3.14H
A
Appendix 15A (No Appendices)
5.3.15A
A
Appendix 16A (No Appendices)
5.3.16A
A
Appendix 17A (No Appendices)
5.3.17A
A
Appendix 18A Cumulative Effects Assessment Long List of Other Developments
5.3.18A
C
ES Chapter 1 Introduction Figures
5.4.1
A
ES Chapter 2 Project Need and Alternatives Figures
5.4.2
A
ES Chapter 3 Description of the Project Figures
5.4.3
E
ES Chapter 4 Approach to preparing the ES Figures (No Figures)
5.4.4
A
ES Chapter 5 Legislative and Policy Overview Figures (No Figures)
5.4.5
A
ES Chapter 6 Landscape and Visual Figures (Part 1 of 15)
5.4.6 (Part 1 of 15)
B
ES Chapter 6 Landscape and Visual Figures (Part 2 of 15)
5.4.6 (Part 2 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 3 of 15)
5.4.6 (Part 3 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 4 of 15)
5.4.6 (Part 4 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 5 of 15)
5.4.6 (Part 5 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 6 of 15)
5.4.6 (Part 6 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 7 of 15)
5.4.6 (Part 7 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 8 of 15)
5.4.6 (Part 8 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 9 of 15)
5.4.6 (Part 9 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 10 of 15)
5.4.6 (Part 10 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 11 of 15)
5.4.6 (Part 11 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 12 of 15)
5.4.6 (Part 12 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 13 of 15)
5.4.6 (Part 13 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 14 of 15)
5.4.6 (Part 14 of 15)
A
ES Chapter 6 Landscape and Visual Figures (Part 15 of 15)
5.4.6 (Part 15 of 15)
A
ES Chapter 7 Historic Environment Figures
5.4.7
A
ES Chapter 8 Biodiversity Figures (Part 1 of 2)
5.4.8 (Part 1 of 2)
C
ES Chapter 8 Biodiversity Figures (Part 2 of 2)
5.4.8 (Part 2 of 2)
C
ES Chapter 9 Hydrology Figures (Part 1 of 2)
5.4.9 (Part 1 of 2)
B
ES Chapter 9 Hydrology Figures (Part 2 of 2)
5.4.9 (Part 2 of 2)
B
ES Chapter 10 Geology and Hydrogeology Figures
5.4.10
A
ES Chapter 11 Agriculture and Soils Figures
5.4.11
A
ES Chapter 12 Traffic and Transport Figures
5.4.12
B
ES Chapter 13 Air Quality Figures
5.4.13
A
ES Chapter 14 Noise and Vibration Figures
5.4.14
A
ES Chapter 15 Health and Wellbeing Figures
5.4.15
A
ES Chapter 16 Socio economics Figures
5.4.16
A
ES Chapter 17 Climate Change Figures (No Figures)
5.4.17
A
ES Chapter 18 Cumulative Effects Figures
5.4.18
B

---
Source: https://www.legislation.gov.uk/uksi/2024/393/schedule/2/part/8 (the official version)
Page: https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-2/part-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.