  "url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-2/part-8/enacted",
  "json_url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/schedule-2/part-8/enacted.json",
  "legislation": "uksi/2024/393",
  "legislation_title": "The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024",
  "legislation_url": "https://openlegislation.uk/national-grid-yorkshire-green-energy-enablement-project-development-consent-order-2024/enacted",
  "path": "schedule/2/part/8",
  "kind": "part",
  "number": "8",
  "heading": "ENVIRONMENTAL STATEMENT DOCUMENTS",
  "text": "Document titleDocument numberVersion\nES Non Technical Summary5.1A\nES Chapter 1 Introduction5.2.1A\nES Chapter 2 Project Need and Alternatives5.2.2A\nES Chapter 3 Description of the Project5.2.3A\nES Chapter 4 Approach to preparing the ES5.2.4A\nES Chapter 5 Legislative and Policy Overview5.2.5A\nES Chapter 6 Landscape and Visual5.2.6A\nES Chapter 7 Historic Environment5.2.7A\nES Chapter 8 Biodiversity5.2.8A\nES Chapter 9 Hydrology5.2.9A\nES Chapter 10 Geology and Hydrogeology5.2.10A\nES Chapter 11 Agriculture and Soils5.2.11A\nES Chapter 12 Traffic and Transport5.2.12A\nES Chapter 13 Air Quality5.2.13A\nES Chapter 14 Noise and Vibration5.2.14A\nES Chapter 15 Health and Wellbeing5.2.15A\nES Chapter 16 Socio economics5.2.16A\nES Chapter 17 Climate Change5.2.17A\nES Chapter 18 Cumulative Effects5.2.18A\nEnvironmental Statement Errata Document5.2.19E\nEnvironmental Statement Addendum5.2.22B\nAppendix 1A Details of Experts and their Experience.pdf5.3.1AA\nAppendix 2A Our Approach to Consenting (National Grid)5.3.2AA\nAppendix 2B Our Approach to Options Appraisal (National Grid)5.3.2BA\nAppendix 3A Embedded Measures Schedule5.3.3AC\nAppendix 3B Code of Construction Practice5.3.3BE\nAppendix 3C Archaeological Written Scheme of Investigation5.3.3CA\nAppendix 3D Biodiversity Mitigation Strategy5.3.3DB\nAppendix 3E Outline Soil Management Plan5.3.3EB\nAppendix 3F Construction Traffic Management Plan5.3.3FD\nAppendix 3G Public Rights of Way Management Plan5.3.3GB\nAppendix 3H Noise and Vibration Management Plan5.3.3HB\nAppendix 3I Arboricultural Impact Assessment (Part 1 of 3) 5.3.3I (Part 1 of 3)D\nAppendix 3I Arboricultural Impact Assessment (Part 2 of 3)5.3.3I (Part 2 of 3)D\nAppendix 3I Arboricultural Impact Assessment (Part 3 of 3)5.3.3I (Part 3 of 3)D\nAppendix 4A Scoping Opinion5.3.4AA\nAppendix 4B Transboundary Screening Matrix5.3.4BA\nAppendix 5A (No Appendices)5.3.5AA\nAppendix 6A EIA Scoping Opinion Responses on Landscape and Visual Assessment5.3.6AA\nAppendix 6B Technical Engagement on Landscape and Visual Assessment5.3.6BA\nAppendix 6C Landscape and Visual Impact Assessment Methodology5.3.6CA\nAppendix 6D Landscape Character Baseline5.3.6DA\nAppendix 6E Landscape Character Sensitivity Assessment5.3.6EA\nAppendix 6F Landscape Character Receptor Assessment5.3.6FA\nAppendix 6G Visual Receptor Assessment5.3.6GA\nAppendix 6H Viewpoint Assessment5.3.6HA\nAppendix 7A Historic Environment Desk Based Assessment5.3.7AA\nAppendix 7B Overton Geophysical Survey Results (Plan Only)5.3.7BA\nAppendix 7C Monk Fryston Geophysical Survey Results (Plan Only)5.3.7CA\nAppendix 7D Tadcaster Geophysical Survey (Report)5.3.7DA\nAppendix 7E Trial Trenching at Overton Substation and Monk Fryston Substation5.3.7EA\nAppendix 7F Technical Note for Beningbrough Hall5.3.7FA\nAppendix 7G Technical Note for Scheduled Monument at Lead5.3.7GA\nAppendix 7H Watching Brief on SI works at Marston Moor5.3.7HA\nAppendix 7I Shipton Geophysical Survey Report5.3.7IB\nAppendix 7J Tadcaster Geophysical Survey Results (Plan Only)5.3.7JA\nAppendix 8A Scoping of Assessment Summary5.3.8AA\nAppendix 8B Extended Phase 1 Habitat Survey Report5.3.8BD\nAppendix 8C CONFIDENTIAL Badger Survey Report5.3.8CA\nAppendix 8D Otter and Water Vole Survey Report5.3.8DA\nAppendix 8E 2021 Wintering Birds Survey Report5.3.8EA\nAppendix 8F 2021-2022 Wintering Birds Survey Report5.3.8FA\nAppendix 8G CONFIDENTIAL Schedule 1 Breeding Bird Survey Report5.3.8GA\nAppendix 8H Bat Survey Report5.3.8HB\nAppendix 8I GCN District Level Licensing Impact Assessment and Conservation Payment Certificate5.3.8IA\nAppendix 8J Confidential Schedule 1 Bird Survey Information5.3.8JA\nAppendix 9A Conservation Sites Screening5.3.9AA\nAppendix 9B WFD Waterbody Status and Objectives5.3.9BA\nAppendix 9C Infrastructure Located in WFD Waterbody5.3.9CA\nAppendix 9D Flood Risk Assessment5.3.9DB\nAppendix 10A Walkover Survey Records5.3.10AA\nAppendix 10B Assessment of Physical Effects on Ground Water (Focus Areas)5.3.10BA\nAppendix 10C Extracts from Unexploded Ordnance (UXO) Reports5.3.10CA\nAppendix 10D Hydrogeology Water Framework Directive (WFD) Assessment5.3.10DA\nAppendix 10E Factual Report on Ground Investigation (Socotec 2022)5.3.10EA\nAppendix 11A Agricultural Land Classification for Shipton North and South CSEC Area5.3.11AA\nAppendix 11B Agricultural Land Classification for Overton Substation5.3.11BA\nAppendix 11C Agricultural Land Classification for Tadcaster CSECs5.3.11CA\nAppendix 11D Agricultural Land Classification for Monk Fryston Substation5.3.11DA\nAppendix 12A Traffic Modelling Tables5.3.12AA\nAppendix 13A IAQM Construction Dust Assessment Methodology Tables5.3.13AA\nAppendix 14A Baseline Noise Report5.3.14AA\nAppendix 14B Construction Plant and Activity Assumptions5.3.14BA\nAppendix 14C Construction Modelling Results5.3.14CA\nAppendix 14D Acoustic Screening Strategy5.3.14DA\nAppendix 14E Overhead Line Noise Assessment5.3.14EA\nAppendix 14F National Grid Policy Statement PS(T)134 (2021)5.3.14FA\nAppendix 14G National Grid Technical Report TR(E)564 (2021)5.3.14GA\nAppendix 14H National Grid Technical Guidance Note TGN(E)322 (2021)5.3.14HA\nAppendix 15A (No Appendices)5.3.15AA\nAppendix 16A (No Appendices)5.3.16AA\nAppendix 17A (No Appendices)5.3.17AA\nAppendix 18A Cumulative Effects Assessment Long List of Other Developments5.3.18AC\nES Chapter 1 Introduction Figures5.4.1A\nES Chapter 2 Project Need and Alternatives Figures5.4.2A\nES Chapter 3 Description of the Project Figures5.4.3E\nES Chapter 4 Approach to preparing the ES Figures (No Figures)5.4.4A\nES Chapter 5 Legislative and Policy Overview Figures (No Figures)5.4.5A\nES Chapter 6 Landscape and Visual Figures (Part 1 of 15)5.4.6 (Part 1 of 15) B\nES Chapter 6 Landscape and Visual Figures (Part 2 of 15)5.4.6 (Part 2 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 3 of 15)5.4.6 (Part 3 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 4 of 15)5.4.6 (Part 4 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 5 of 15)5.4.6 (Part 5 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 6 of 15)5.4.6 (Part 6 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 7 of 15)5.4.6 (Part 7 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 8 of 15)5.4.6 (Part 8 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 9 of 15)5.4.6 (Part 9 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 10 of 15)5.4.6 (Part 10 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 11 of 15)5.4.6 (Part 11 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 12 of 15)5.4.6 (Part 12 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 13 of 15)5.4.6 (Part 13 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 14 of 15)5.4.6 (Part 14 of 15)A\nES Chapter 6 Landscape and Visual Figures (Part 15 of 15)5.4.6 (Part 15 of 15)A\nES Chapter 7 Historic Environment Figures5.4.7A\nES Chapter 8 Biodiversity Figures (Part 1 of 2) 5.4.8 (Part 1 of 2) C\nES Chapter 8 Biodiversity Figures (Part 2 of 2)5.4.8 (Part 2 of 2)C\nES Chapter 9 Hydrology Figures (Part 1 of 2) 5.4.9 (Part 1 of 2) B\nES Chapter 9 Hydrology Figures (Part 2 of 2)5.4.9 (Part 2 of 2)B\nES Chapter 10 Geology and Hydrogeology Figures5.4.10A\nES Chapter 11 Agriculture and Soils Figures5.4.11A\nES Chapter 12 Traffic and Transport Figures5.4.12B\nES Chapter 13 Air Quality Figures5.4.13A\nES Chapter 14 Noise and Vibration Figures5.4.14A\nES Chapter 15 Health and Wellbeing Figures5.4.15A\nES Chapter 16 Socio economics Figures5.4.16A\nES Chapter 17 Climate Change Figures (No Figures)5.4.17A\nES Chapter 18 Cumulative Effects Figures5.4.18B",
  "extent": "E+W+S",
  "status": null,
  "version": "enacted",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/393/schedule/2/part/8",
    "retrieved_at": "2026-10-28T21:32:16.250831+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}