# The Net Zero Teesside (Amendment) Order 2025, Article 18: Amendment to Schedule 14 (documents and plans to be certified)


In Schedule 14 (documents and plans to be certified) Table 13 is omitted and replaced with the following—
“
Table 13
(1)
Document name
(2)
Document reference
(3)
Revision number
(4)
Date
access and rights of way plans
4.5
7
January 2025
application guide
1.2
20
February 2025
book of reference
3.1
8
April 2023
supplemental book of reference
3.1b
1
January 2025
design and access statement
5.4
6
February 2025
environmental statement
Non-technical summary, 6.1
–
As listed in the application guide
Volume 1, 6.2
–
Volume 2, 6.3
–
Volume 3, 6.4
–
Non-technical Summary of Environmental Statement Addendum, 7.7
–
Environmental Statement Addendum Volume 1, 7.8.1
–
Environmental Statement Addendum Volume II, 7.8.2
–
Non-Technical Summary of Second Environmental Statement Addendum, 7.10
–
Second Environmental Statement Addendum, Volume 1, 7.11.1
–
Second Environmental Statement Addendum, Volume II, 7.11.2
–
Non-Technical Summary of Third Environmental Statement Addendum, 7.14
–
Third Environmental Statement Addendum – Volume 1, 7.15.1
–
Third Environmental Statement Addendum Volume II, 7.15.2
–
DCO Non-Material Change Environmental Statement Addendum Volume I – Main Text (6.7a)
–
DCO Non-Material Change Environmental Statement Addendum
–
Volume II – Figures (6.7b)
–
DCO Non-Material Change Environmental Statement Non-Technical Summary
–
(6.7c)
–
framework construction environmental management plan
6.45
3
October 2022
indicative lighting strategy
5.11
1
May 2021
indicative landscape and biodiversity strategy
5.12
2
August 2022
land plans
4.2
7
January 2025
Net Zero Teesside Anglo American Shared Areas Plan
4.17
2
January 2025
parking plan
4.16.2
3
October 2022
PCC site access plan
4.16.3
2
August 2022
Sembcorp Pipeline Corridor protective provisions supporting plan
4.19
2
January 2025
Sembcorp Protection Corridor protective provisions supporting plans
4.20
2
January 2025
updated landscape and biodiversity plan
4.15
5
January 2025
water connection plan
4.16.4
2
August 2022
works plans
4.4
7
January 2025
”

---
Source: https://www.legislation.gov.uk/uksi/2025/1143/article/18 (the official version)
Page: https://openlegislation.uk/net-zero-teesside-amendment-order-2025/article-18
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

