# The Net Zero Teesside Order 2024, Paragraph 18: Construction, Operation and Maintenance

Extent: E+W+S

The relevant undertaker must—
(a) not discharge waste concrete slurry or wash water from concrete or cement into the marine environment; and
(b) site concrete and cement mixing and washing areas at least 10 metres from the River Tees or surface water drain to minimise the risk of run off entering the marine environment.

---