# The Net Zero Teesside Order 2024, Paragraph 63: Consent under this Part

Extent: E+W+S

Where formal consent is required under the CATS requirements for works within the wayleave of the CATS pipelines (between 3.5 metres to 7.5 metres either side of the pipeline, depending on location), approval given by CATS under paragraph 61 constitutes formal consent for the purposes of the CATS requirements.

---