Table 14
Component
Maximum Length
(m)
Maximum Width
(m)
Maximum Height (m AOD)
Gas turbine hall
76
76
43
Heat recovery steam generator building
63
28
63
Heat recovery steam generator stack
9.0 m
(inner diameter)
98
Steam turbine hall
64
54
43
Absorber tower
35
25
93
Absorber stack
7.0 m
(inner diameter)
128
Low carbon electricity generating station electrical substation
130
120
42
New electrical substation at Tod Point
22
National Grid Tod Point substation extension (northern bay)
22
National Grid Tod Point substation extension (southern bay)
22

---
Source: https://www.legislation.gov.uk/uksi/2024/174/schedule/15 (the official version)
Page: https://openlegislation.uk/net-zero-teesside-order-2024/schedule-15
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.