# The Net Zero Teesside Order 2024, Paragraph 1: Interpretation

Extent: E+W+S

In this Schedule—
“Work No. 2A infrastructure” means any works or development comprised within Work No. 2A, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 2A on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus;
“Work No. 2B infrastructure” means any works or development comprised within Work No. 2B, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 2B on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus;
“Work No. 3 infrastructure” means any works or development comprised within Work No. 3A or Work No. 3B, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 3A or Work No. 3B on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus;
“Work No. 4A infrastructure” means any works or development comprised within Work No. 4A, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 4A on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus;
“Work No. 5B infrastructure” means any works or development comprised within Work No. 5B, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 5B on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus;
“Work No. 5C infrastructure” means any works or development comprised within Work No. 5C, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 5C on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus;
“Work No. 6 infrastructure” means any works or development comprised within Work No. 6, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 6 on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus;
“Work No. 8 infrastructure” means any works or development comprised within Work No. 8, ancillary apparatus and any other necessary works or development permitted within the area delineated as Work No. 8 on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus; and
“Work No. 10 access and highway improvements” means any works or development comprised within Work No. 10 including any other necessary works or development permitted within the area delineated as Work No. 10 on the works plans including the alteration, diversion or construction of statutory undertakers’ apparatus.
Table 7
(1)
Plot numbers shown on Land Plans
(2)
Purposes for which rights over land may be acquired or restrictive covenants may be imposed
The following plots shown coloured blue on the land plans— 105, 110, 113, 114, 316, 319, 320, 324, 332, 343, 344, 345, 347, 349, 350, 351, 352, 354, 355, 356, 357, 358, 359, 360, 365, 366, 382, 384, 395, 397, 401, 408, 409, 409a, 409b, 425, 425a, 462, 464
For and in connection with the Work No. 2A infrastructure, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 2A infrastructure and Work No. 2B infrastructure, together with the right to install, retain, use and maintain the Work No. 2A infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 2A infrastructure, or interfere with or obstruct access from and to the Work No. 2A infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured pink on the land plans— 112, 325, 328, 329, 330, 333, 450, 455, 456, 457
The following plots shown coloured pink on the land plans— 112, 325, 328, 329, 330, 333
For and in connection with the Work No. 2B infrastructure, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 2B infrastructure, together with the right to install, retain, use and maintain the Work No. 2B infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 2B infrastructure, or interfere with or obstruct access from and to the Work No. 2B infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured blue on the land plans— 386, 387, 388, 393, 393c, 393f, 395, 401, 405, 408, 409, 409a, 409b, 412, 413, 416, 417, 418, 419, 420, 421, 423, 425, 425a, 427, 431, 432, 436, 439, 462, 464, 540a, 540d
For and in connection with the Work No. 3 infrastructure, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 3 infrastructure, together with the right to install, retain, use and maintain the Work No. 3 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 3 infrastructure, or interfere with or obstruct access from and to the Work No. 3 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured pink on the land plans— 391, 393b, 396, 398, 399, 400, 403, 404, 406, 411, 414, 422, 424, 429, 449, 450, 451, 452, 454, 455, 456, 457, 540b, 540c
The following plots shown coloured blue on the land plans— 409a, 425a, 458, 461, 463, 467, 470, 472, 473, 498, 509, 512, 515, 516, 518, 519, 521, 522, 524, 525, 531, 535, 536, 537, 538
For and in connection with the Work No. 4 infrastructure, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured blue on the land plans— 320, 332, 343, 345, 347, 366, 382, 384, 395, 397, 401, 408, 409, 409a, 409b, 425, 425a, 462, 464
For and in connection with the Work No. 5C infrastructure, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 5C infrastructure, together with the right to install, retain, use and maintain the Work No. 5C infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 5C infrastructure, or interfere with or obstruct access from and to the Work No. 5C infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured pink on the land plans— 450, 455, 456, 457
The following plots shown coloured blue on the land plans— 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 20a, 21, 22, 23, 24, 25, 26, 28, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 56, 57, 58, 59, 60, 61, 62, 63, 65, 66, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 93, 94, 95, 96, 99, 100, 101, 102, 115, 119, 120, 121, 124, 124d, 128, 138, 139, 141, 142, 142b, 156, 157, 157b, 158, 165, 165a, 166, 166b, 169, 171, 171b, 172, 174, 174d, 174e, 176, 176b, 181, 183, 184, 191d, 194, 196, 278, 280, 281, 284, 285, 286, 294, 301, 302, 303, 314, 315, 316, 317, 318, 319, 320, 321, 322, 324, 331, 332, 343, 344, 345, 347, 349, 350, 351, 352, 354, 355, 356, 357, 358, 359, 360, 365, 366, 382, 384, 395, 397, 401, 405, 408, 409, 409a, 409b, 421, 423, 425, 425a, 462, 464
For and in connection with the Work No. 6 infrastructure, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, together with the right to install, retain, use and maintain the Work No. 6 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 6 infrastructure, or interfere with or obstruct access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured pink on the land plans— 325, 328, 329, 330, 333, 385, 394, 400, 404, 411 422, 424, 429, 450, 455, 456, 457
The following plots shown coloured pink on the land plans— 392, 415, 429, 447
For and in connection with the Work No. 8 infrastructure, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 8 infrastructure, together with the right to install, retain, use and maintain the Work No. 8 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 8 infrastructure, or interfere with or obstruct access from and to the Work No. 8 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured blue on the land plans— 89, 91, 92, 98, 103, 106, 108, 110 111, 126, 136, 137, 143, 144, 145, 146, 147, 148, 150, 151, 152, 153, 157b, 165a, 167, 168, 170, 174e, 181, 186, 187, 316, 319, 320, 324, 332, 343, 344, 345, 347, 349, 350, 351, 352, 354, 355, 356, 357, 358, 359, 360, 365, 366, 377, 378, 382, 384, 386, 387, 388, 393, 393c, 393f, 395, 397, 401, 405, 408, 409, 409a, 409b, 412, 413, 416, 417, 418, 419, 420, 421, 423, 425, 425a, 426, 427, 431, 432, 434, 435, 436, 438, 439, 445, 458, 458a, 459, 461, 462, 463, 464, 467, 470, 472, 473, 474, 475, 477, 478, 483, 485, 486, 487, 488, 489, 493, 495, 496, 498, 500, 502, 504, 505, 508, 509, 510, 511, 512, 514, 515, 516, 517, 518, 519, 521, 522, 523, 524, 532, 533, 534, 540d
For and in connection with the Work No. 10 access and highway improvements, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the authorised development, along with the right to prevent any works on or uses of the land which may interfere with or obstruct access from and to the authorised development, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
The following plots shown coloured pink on the land plans— 325, 327, 328, 329, 330, 333, 339, 391, 393b, 403, 450, 455, 456, 457, 479, 482, 540b, 540c
The following plots shown coloured blue on the land plans— 377, 378, 379, 448, 494, 499, 501, 526, 527, 528, 529, 530, 539
For and in connection with the Work No. 5B infrastructure (except where the right to install, retain, use and maintain the Work No. 5B infrastructure is within the subsoil only), the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 5B infrastructure, together with the right, including within the subsoil, for the undertaker and all persons authorised on its behalf to install, retain, use and maintain the Work No. 5B infrastructure, and a right of support for it, and the right to the free flow of water (as relevant), along with the right to prevent any works on or uses of the land or, in the case of a right within the subsoil any works or uses above, under and adjoining such subsoil, which may interfere with or damage the Work No. 5B infrastructure, including the right to prevent or remove the whole of any fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land or subsoil (as relevant).
The following plot shown coloured pink on the land plans— 402
The following plots shown coloured blue on the land plans— 185, 190, 190b, 191, 191a, 191b, 202c, 218, 232a, 252, 252a, 253, 253a, 255, 263
For and in connection with the Work No. 6 infrastructure (except where the right to install, retain, use and maintain the Work No. 6 infrastructure is within the subsoil only), the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, together with the right, including within the subsoil, for the undertaker and all persons authorised on its behalf to install, retain, use and maintain the Work No. 6 infrastructure, and a right of support for it, and the right to the free flow of water (as relevant), along with the right to prevent any works on or uses of the land or, in the case of a right within the subsoil any works or uses above, under and adjoining such subsoil, which may interfere with or damage the Work No. 6 infrastructure, including the right to prevent or remove the whole of any fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land or subsoil (as relevant).
The following plots shown coloured blue on the land plans— 377, 378, 379, 448, 494, 499, 501, 526, 527, 528, 529, 539
For and in connection with the Work No. 8 infrastructure (except where the right to install, retain, use and maintain the Work No. 8 infrastructure is within the subsoil only), the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 8 infrastructure, together with the right, including within the subsoil, for the undertaker and all persons authorised on its behalf to install, retain, use and maintain the Work No. 8 infrastructure, and a right of support for it, and the right to the free flow of water (as relevant), along with the right to prevent any works on or uses of the land or, in the case of a right within the subsoil any works or uses above, under and adjoining such subsoil, which may interfere with or damage the Work No. 8 infrastructure, including the right to prevent or remove the whole of any fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land or subsoil (as relevant).
The following plot shown coloured pink on the land plans— 402

---
Source: https://www.legislation.gov.uk/uksi/2024/174/schedule/7/paragraph/1 (the official version)