# The Network Rail (Buxton Sidings Extension) Order 2017, Schedule 1: SCHEDULED WORKS


In the County of Derbyshire, District of High Peak—
Work No. 1 – A railway (695 metres in length) forming an extension of existing sidings commencing at a point 150 metres east of the junction of Williamson Avenue with Ladycroft and terminating at a point 355 metres south of the junction of Brown Edge Road with Footpath FP4.
Work No. 2 – A footbridge (42 metres in length) commencing at a point 140 metres east of the junction of Brown Edge Road with Brown Edge Close and terminating at a point 230 metres north-west of the junction of Nunsfield Road with Barms Way.
Work No. 3 – A diversion of an electricity cable (35 metres in length) commencing beneath a point 140 metres east of the junction of Brown Edge Road with Brown Edge Close and terminating beneath a point 180 metres east of that junction.

---
Source: https://www.legislation.gov.uk/uksi/2017/1150/schedule/1 (the official version)
Page: https://openlegislation.uk/network-rail-buxton-sidings-extension-order-2017/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.