# The Network Rail (Cambridge Re-Signalling) Order 2024, Paragraph 5


For the purposes of paragraph 4—
(a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
(b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

---
Source: https://www.legislation.gov.uk/uksi/2024/724/schedule/6/paragraph/5 (the official version)
Page: https://openlegislation.uk/network-rail-cambridge-re-signalling-order-2024/schedule-6/paragraph-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.