# The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022, Paragraph 65: Access


Network Rail must on being given reasonable notice (save in the event of an emergency)—
(a) at all times afford reasonable facilities to the engineer for access to the specified works during their construction;
(b) supply the engineer with all such information as the engineer may reasonably require with regard to those specified works or the method of their construction.

---