# The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022, Schedule 4: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN


(1)
Area
(2)
Number of land shown on the deposited plans
(3)
Purpose for which temporary possession may be taken
(4)
Relevant part of the authorised works
In the County of Cambridgeshire, City of Cambridge
1, 12, 13, 15a, 16, 17, 25, 26 and 28
Access for construction and works site
Work Nos. 1 and 2
2
Access for construction, works site, and construction compound.
Work Nos. 1 and 2
4, 5, 4d, 4e, 4f, 4g and 6a
Access for construction and works site, accommodation works, landscaping, drainage works.
Work Nos. 4 and 5
6, 8, 8a and 10
Access for construction, works site, accommodation works, landscaping works, drainage works, environmental mitigation, works compound, temporary storage of materials.
Work Nos. 1, 3, 4, 6, 7 and 11
11, 84b (part), 85, 87, 88 (part), 90 and 91 (part)
Access for construction, works site and accommodation works, landscaping and drainage works.
Work Nos. 6, 7 and 11.
41,41a, 45, 45a, 45b, 45c, 46, 49, 51, 53, 55, 56 and 57
Access for construction, works site, accommodation works, landscaping works and drainage works.
Work Nos. 3, 6 and 7
54a, 59, 60, 61, 62, 63, 64, 65, 66, 67 and 68
Access for construction, works site, accommodation works, works compound, landscaping works, environmental mitigation, drainage works and works for temporary diversion of National Cycle Network Route 11 and Genome path.
Work Nos. 3, 6 and 7
In the County of Cambridgeshire, District of South Cambridgeshire
69, 76, 77, 78, 79, 80, 81, 82 and 83
Access for construction, works site, accommodation works, works compound, landscaping works, environmental mitigation, drainage works and works for temporary diversion of National Cycle Network Route 11 and Genome path.
Work Nos. 3, 6 and 7
84, 84b (part), 88 (part), 91 (part), 93 and 94
Access for construction, works site and accommodation works, landscaping and drainage works.
Work Nos. 6, 7, and 11
95
Access for construction (including protective measures/works for scheduled ancient monument) works site and compound.
Work Nos. 8, 9 and 10
99
Access for construction, works site, accommodation works and drainage works.
Work Nos. 8, 9 and 10
97, 100, 101, 105, 106 and 107
Access for construction, works site and accommodation works
Work Nos. 8 and 10

---
Source: https://www.legislation.gov.uk/uksi/2022/1406/schedule/4 (the official version)