# The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022, Schedule 5: CLOSURE OF LEVEL CROSSINGS


(1)
Area
(2)
Level crossings to be discontinued
(3)
Alternative
In the County of Cambridgeshire, District of South Cambridgeshire
Dukes No.2 level crossing at the point marked with a blue line on sheet 4 of the deposited plans
Work No. 11
In the County of Cambridgeshire, District of South Cambridgeshire
Websters level crossing at point marked with a blue line on sheet 5 on the deposited plans
Work No. 11

---
Source: https://www.legislation.gov.uk/uksi/2022/1406/schedule/5 (the official version)
Page: https://openlegislation.uk/network-rail-cambridge-south-infrastructure-enhancements-order-2022/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

