# The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017, Article 4: Power to construct and maintain works


(1) Network Rail may construct and maintain within the Order limits such works as are required:—
(a) in connection with the extinguishment of the right of way specified in paragraph (2) of article 5 (closure of level crossing);
(b) to provide the new public right of way;
including the provision of a culvert and any fencing, stiles, gates, signs or other conveniences as may be necessary or expedient for the purposes of the provision or extinguishment of the rights of way.

---