# The Network Rail (Felixstowe Branch Line Improvements – Level Crossings Closure) Order 2018, Article 4: Power to deviate


In constructing or maintaining the scheduled work, Network Rail may—
(a) deviate laterally from the lines or situations shown on the deposited plans to the extent of the limits of deviation for that work; and
(b) deviate vertically from the levels shown on the sections to any extent not exceeding 0.5 metres upwards or downwards.

---
Source: https://www.legislation.gov.uk/uksi/2018/937/article/4 (the official version)
Page: https://openlegislation.uk/network-rail-felixstowe-branch-line-improvements-level-crossings-closure-order-2018/article-4