Article 5 Level crossings and highways to be stopped up
Subject to the provisions of this article, the level crossings listed in column (2) of Parts 1 and 2 of Schedule 3 (level crossings and highways to be stopped up) are stopped up and discontinued.
Upon the stopping up and discontinuance of the level crossings referred to in paragraph (1)—
all rights of way (whether public or private) over those crossings are extinguished; and
all public rights of way over the highways specified in column (3) of Parts 1 and 2 of Schedule 3 are extinguished to the extent specified by reference to the points identified by letters and numbers.
Upon the stopping up and discontinuance of Grimston Lane Level Crossing, section 15(5)(b) (further works and powers) of the British Transport Commission Act 1959f3 ceases to have effect.
Upon the stopping up and discontinuance of Keeper’s Lane Level Crossing, the Railtrack Keeper’s Lane Level Crossing Order 1999f4 is revoked.
In respect of the level crossings listed in Part 1 of Schedule 3, paragraphs (1) and (2) are not to have effect until the new highway or highways specified in column (4) in relation to that level crossing has or have been provided to the reasonable satisfaction of the highway authority in accordance with article 6 (creation and maintenance of new footpaths or bridleways) and is or are open for use.
Any person who suffers loss by reason of the extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
This article is subject to Schedule 4 (apparatus and rights of statutory undertakers etc. in stopped up highways).