  "heading": "Power to construct and maintain works",
  "text": "(1) Network Rail may construct and maintain the scheduled work.\n(2) Subject to article 6 (power to deviate), the scheduled work may only be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited section.\n(3) Network Rail may, on the land specified in columns (1) and (2) of Schedule 2 (acquisition of certain lands for ancillary works), carry out and maintain any works specified in column (3) of that Schedule in relation to that land, with all necessary works and conveniences in connection with those works.\n(4) Network Rail may, on the land specified in article 20(1) (cases where powers of acquisition limited to railway protection rights), carry out and maintain any works specified in relation to that land in article 20(5)(a) with all necessary works and conveniences in connection with those works.\n(5) Subject to paragraph (7), Network Rail may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the scheduled work, namely—\n(a) railway electrification, signalling and permanent way works;\n(b) buildings, yards, machinery, plant, apparatus and other works and conveniences;\n(c) approaches, ramps, passages, means of access, shafts and stagings;\n(d) embankments, aprons, abutments, retaining walls, wing walls, culverts;\n(e) works to alter or remove any structure erected upon any highway or adjoining land;\n(f) works to alter the position of apparatus, including mains, sewers, drains, cables and street furniture;\n(g) works to reconfigure the layout of the Huyton Bus Station in connection with the construction of the scheduled work;\n(h) landscaping and works to mitigate any adverse effects of the construction, maintenance or operation of the scheduled work; and\n(i) works for the benefit or protection of premises affected by the scheduled work.\n(6) Subject to paragraph (7), Network Rail may carry out such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the scheduled work, other than works that would interfere with a navigable watercourse.\n(7) Paragraphs (5) and (6) only authorise the carrying out or maintenance of works outside the limits of deviation if such works are carried out on—\n(a) land specified in columns (1) and (2) of Schedule 2 for the purpose specified in relation to that land in column (3) of that Schedule; or\n(b) land specified in columns (1) and (2) of Schedule 6 (land of which temporary possession may be taken) for the purposes specified in column (3) of that Schedule.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 5 in force at 19.8.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/2027/article/5",
    "retrieved_at": "2026-10-29T00:07:46.124352+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}