# The Network Rail (Ipswich Chord) Order 2012, Article 9: Street works

Extent: E+W+S

(1) Network Rail may, for the purposes of the authorised project, enter on any of the streets specified in Schedule 2 (streets subject to street works) within the Order limits to the extent necessary and may—
(a) break up or open the street, or any sewer, drain or tunnel under it;
(b) place temporary apparatus in the street and permanent apparatus under the street;
(c) maintain temporary apparatus in the street and permanent apparatus under the street and, in either case, change its position;
(d) execute any works required for or incidental to any works referred to in sub-paragraphs (a), (b) and (c).
(2) In this article “apparatus” has the same meaning as in Part 3 of the 1991 Act and “in” as referring to apparatus in the street, means under, over, across, along or upon the street.

---
Source: https://www.legislation.gov.uk/uksi/2012/2284/article/9 (the official version)
Page: https://openlegislation.uk/network-rail-ipswich-chord-order-2012/article-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.