# The Network Rail (North Doncaster Chord) Order 2012, Article 11: Street works

Extent: E+W+S

(1) Network Rail may, for the purposes of the authorised development, enter upon so much of any of the streets specified in Schedule 4 (streets subject to street works) as is within the Order limits and may—
(a) break up or open the street, or any sewer, drain or tunnel under it;
(b) tunnel or bore under the street;
(c) place apparatus in the street;
(d) maintain apparatus in the street or change its position; and
(e) execute any works required for or incidental to any works referred to in sub-paragraphs (a), (b) (c) and (d).
(2) In this article, “apparatus” has the same meaning as in Part 3 of the 1991 Act.

---