Doncaster Metropolitan Borough
Rockley Lane
Create new passing bays between points PB1-PB2, PB3-PB4, PB5-PB6, PB7-PB8 and PB9-PB10 shown on the design drawings (Temporary Works).
Widen street between point WS1 and WS2 (Holme Lane and Storrs Lane) to accommodate traffic shown on the design drawings (Temporary Works).
Holme Lane
Create new passing bays between point PB11-PB12, PB13-PB14 and PB15-PB16 shown on the design drawings (Temporary Works).

---