# The Network Rail (North Doncaster Chord) Order 2012, Schedule 5: STREETS TO BE STOPPED UP

Extent: E+W+S

(1)
Area
(2)
Street to be stopped up
(3)
Extent of stopping up
(4)
New Street to be substituted
Doncaster Metropolitan Borough
Joan Croft Lane
Road over Joan Croft Level Crossing and south east section of Joan Croft Lane between points V and W.
New access to be provided over new highway bridge over railway (Work No.8) between points S and U via point T.
Farm access over Honey Lands Lane level crossing and Footpath 11 south to Honey Lands Lane.
Stopping up of farm access between points 1, 2 and 3.
Stopping up of Footpath 11 between points 2 and 2a.
New farm access and footpath to be provided between point 1 and point 4, between point 4 and point 5 and between point 5 and point 3.
Honey Lands Lane at junction with Joan Croft Lane
Close bridleway 13 between points 6 and 7.
Proposed new bridleway to be created between point 6 and point 8.

---
Source: https://www.legislation.gov.uk/uksi/2012/2635/schedule/5 (the official version)
Page: https://openlegislation.uk/network-rail-north-doncaster-chord-order-2012/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

