# The Network Rail (North Doncaster Chord) Order 2012, Schedule 7: REPLACEMENT AND CLOSURE OF LEVEL CROSSINGS

Extent: E+W+S

(1)
Area
(2)
Level crossing to be discontinued
(3)
Street to be stopped up
(4)
New street to be substituted
Doncaster Metropolitan Borough
Joan Croft Level Crossing
Joan Croft Lane over the level crossing and the south eastern section of Joan Croft Lane between points V and W
New access to be provided over new highway bridge over railway line (Work No.8) between points S and U via point T
Owston Grange No. 1 Level Crossing
Stopping up of the farm access between points 1, 2 and 3
New boundary and farm access to be provided between point 1 and point 4, point 4 and point 5, and point 5 and point 3

---
Source: https://www.legislation.gov.uk/uksi/2012/2635/schedule/7 (the official version)
Page: https://openlegislation.uk/network-rail-north-doncaster-chord-order-2012/schedule-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

