# The Network Rail (Norton Bridge Area Improvements) Order 2014, Article 41: Certification of plans etc.

Extent: E+W+S

(1) Network Rail must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—
(a) the book of reference;
(b) the land plans;
(c) the works plans;
(d) the street plans;
(e) the traffic regulation order plans;
(f) the sections;
(g) the design brief;
(h) the design drawings; and
(i) the environmental statement,
for certification that they are true copies of the documents referred to in this Order.
(2) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

---
Source: https://www.legislation.gov.uk/uksi/2014/909/article/41 (the official version)
Page: https://openlegislation.uk/network-rail-norton-bridge-area-improvements-order-2014/article-41
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

