# The Network Rail (Norton Bridge Area Improvements) Order 2014, Schedule 6: REPLACEMENT AND CLOSURE OF LEVEL CROSSING

Extent: E+W+S

(1)
Area
(2)
Level crossing to be discontinued
(3)
Street to be stopped up
(4)
New street to be substituted
County of Staffordshire, Borough of Stafford
Footpath 10 across the Stone railway line at Mid Norton
Between points 27 and 28 on the street plans
A new footbridge 15 metres from existing level crossing

---