# The Network Rail (Thameslink 2000) Order 2006, Article 7: Station works at Blackfriars


(1) Network Rail may, at Blackfriars in the City of London and the London borough of Southwark in the construction of Works Nos. 3, 4, 5, and 6, and within the limits of deviation for those works—
(a) alter and extend Blackfriars station with all necessary works and conveniences connected therewith, including a canopy over Network Rail’s platforms at that station;
(b) provide a station pedestrian access incorporating a lift and staircase and a footbridge over Queen Victoria Street between points D1 and D2 connecting with a high level walkway to Network Rail’s platforms at Blackfriars Station;
(c) stop up the footpath between points F1 and F2 and construct a new footpath between points F1, F3, F4 and F2.
(2) In constructing or maintaining the footbridge referred to in paragraph (1)(b), Network Rail may deviate vertically from the levels shown on the deposited section to any extent not exceeding 0.75 metres upwards or downwards.

---
Source: https://www.legislation.gov.uk/uksi/2006/3117/article/7 (the official version)
Page: https://openlegislation.uk/network-rail-thameslink-2000-order-2006/article-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

