# The Network Rail (Tinsley Chord) Order 2015, Schedule 1: SCHEDULED WORKS

Extent: E+W+S

In the City of Sheffield—
Work No. 1 – A railway forming a double line of tramroad (100 metres in length), commencing by a junction with the LRT system at a point 4 metres north of the bridge carrying the LRT system over the River Don, passing north-eastwards then eastwards beneath the viaduct carrying the M1 Motorway and then north-eastwards and terminating at a point 100 metres north-east of its commencement.
Work No. 2 – A railway forming a single line of tramroad (70 metres in length), commencing by a junction with the termination of Work No. 1, passing eastwards and terminating at a point 70 metres north-east of the viaduct carrying the M1 Motorway and A631 Trunk Road and forming a connection to the Sheffield to Rotherham Railway.

---
Source: https://www.legislation.gov.uk/uksi/2015/1876/schedule/1 (the official version)
Page: https://openlegislation.uk/network-rail-tinsley-chord-order-2015/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.